SJE-Rhombus Controls LevCon Controller Operation Manual
6
LOG SCREENS
The
LevCon
™ controller navigation from the main screen:
P1
P1
HRS 000
HRS 0000 :
0 :00
P2
P2
HRS 000
HRS 0000 :
0 :00
P1
P1
EC
EC
000000
00000
P2
P2
EC
EC
000000
00000
MON
MON P1
P1 5 P2
P2 5
LAG 3
LAG 3 HWA
HWA 0
TUE
TUE P1
P1 5 P2
P2 5
LAG 3
LAG 3 HWA
HWA 0
SUN
SUN P1
P1 5 P2
P2 5
LAG 3
LAG 3 HWA
HWA 0
.
.
.
TRANSDUCER
TRANSDUCER
:HIGH
:HIGH
FLOAT
FLOAT
:LOW
:LOW
PUMP1
PUMP1
:FAIL
FAIL
SEAL
SEAL
PUMP2
PUMP2
:FAIL
FAIL
SEAL
SEAL
<
<
<
<
<
<
<
<
<
<
<
<
<
<
P1 & P2 run time meters
P1 & P2 cycle counters
hours minutes
(0-60)
Monday log
1.
EC
=
P1 cycle
counter
2.
EC
=
P2 cycle
counter
3.
LAG
=
Lag
counter
4.
HWA
=
High level
counter
Back to main screen
1
2
3
4
Back to
main screen
High level transducer
alarm and low level float
switch alarm
Pump 1 & Pump 2
alarms : seal = seal fail
fail = overload or overtemp