![Sita LCD Series Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/sita/lcd-series/lcd-series_manual-of-installation-use-and-servicing_1285533008.webp)
7
4.
The UV Chamber Installation
4.1 Assembling of the UV chamber
Screw the nylon sleeve bolts, pressurize the plant and verify
Insert the quartz sleeves using the special guide bar supplied.
that are not water leaks from nylon sleeves bolt.
Insert the o-ring on the sleeves.
Unscrew the nylon sleeves bolts.
Extract the inox cover.