Fig. 3: 584 PROFLAME G Fire Receiver batteries housing
5
ENGLISH
Fig. 2: 584 PROFLAME G Fire Receiver
2 PIN terminal
3 Positions Slider
Installing the wall cover plate
1. Install the receiver in the J box using the existing J box screws.
2. Place the slider into the cover plate with the white dot on the right
side.
3. Put the receiver switch in the “OFF” position.
4. Make sure the receiver and cover plate words “ON” are on the
same side.
5. Align the slider with the switch on the receiver and couple the
switch into the slider.
6. Align the screw holes.
7. Using the two (2) screws provided secure the cover plate to the receiver.