background image

 

 

2.1. Overhead installation

 

 

 

Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and 
EN60598-2-17 
 
 
 

The suspension devices have to be build and 
of the payload without suffering a permanent detrimental deformation.
 
Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspensio
fall down in case of failure. 
 
During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or an
 
The operator is obliged to following safety
 

Before  the  first  start-up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 
expert. 

Review in the frame of the inspec

Review by a qualified person at least once a year. 

 
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area of people
 
IMPORTANT! Overhead installati
calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this. Do not try to carry
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties. 
 
It is not allowed to install the device in the grip area of 
 
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room. 
 
Please note: Crashing down items can cause serious injuries! Do not install 
the safety of a possible installation form!
 
Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 
the own weight of the device. 
 
Mount the device with the mounting
 
During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 

5 / 8 

Overhead installation 

Danger of life! 
You have to observe the regulations of BGV C1 (formerly VBG 70) and 

17 Installations are to carry out by skilled personnel only.

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 
of the payload without suffering a permanent detrimental deformation. 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden. 

The operator is obliged to following safety-related and mechanical facilities:  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

Review in the frame of the inspection test at least all four years by an expert.  .
Review by a qualified person at least once a year.  

How to carry out the overhead installation: 
In tidal fall you should install the device out of the lounge area of people 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this. Do not try to carry
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties.  

It is not allowed to install the device in the grip area of people. 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room.  

Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt 
the safety of a possible installation form! 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

Mount the device with the mounting-bracket to your trussing system using an appropriate clamp. 

During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick-release safety fastener elements 

be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 

You have to observe the regulations of BGV C1 (formerly VBG 70) and 

Installations are to carry out by skilled personnel only. 

measured so they can withstand for an hour the tenfold 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 

n must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 

y other danger zones is forbidden.  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

tion test at least all four years by an expert.  . 

on requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this. Do not try to carry out installation 
yourself under any circumstances if you are not qualified. Contact a professional installer. An 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 

the projector, if you doubt 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

your trussing system using an appropriate clamp.  

During overhead installation the device must be always secured by a safety rope which is designed to 

release safety fastener elements 

be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 

Содержание KF-12

Страница 1: ...Manual Speaker KF 12...

Страница 2: ...2 8 Table of contents 1 Safety instructions 3 1 1 For safe and efficient operation 3 2 Designated use 4 2 1 Overhead installation 5 3 Introduction 7 4 Technical data 7...

Страница 3: ...vice will void the warranty Repairs are to carry out by skilled personnel only Use only fuses of the same type and original parts as spare parts For safe and efficient operation Be careful with heat a...

Страница 4: ...og machine Make sure that the saturation of the fog has to enable a visibility of at least 10m Make sure that during the installation and removal of the device the area below the place of installation...

Страница 5: ...al changes before restarting it has to be checked by an Review in the frame of the inspection test at least all four years by an expert Review by a qualified person at least once a year How to carry o...

Страница 6: ...cking nut A safety rope once exposed to failing load or damaged may not be used furthermore The maximum drop exceed must not exceed 20cm A safety rope once exposed to failing load or damaged may not b...

Страница 7: ...Frequency response 48 Hz 18 kHz 10 dB Crossover 3 3 kHz Sensitivity Sensitivity 1W 1m 96 dB SPL Program 125 dB peak Components Transducer MF 12 Aluminum Chassis 2 5 voice coil 50 Oz Transducer HF PK...

Страница 8: ...8 8 Importer B K Braun GmbH Industriestra e 2 D 76307 Karlsbad www bkbraun com info bkbraun com...

Отзывы: