ANNEX 1

 

Instructions for Use of Conversion Cables 

 

 

Conversion cables are required to meet any of the following conditions: 

 

1.

 

When input terminal of DC side of inverter or collecting board is original MC4. 

2.

 

When the inverter or the collecting board manufacturer requests serial DC input, bus terminal should 

be MC4.  Before use: 

1.

 

Verify the compatibility of the conversion cable with the original MC4 connector and the MC4 connector. 

2.

 

Make sure the connector on the conversion cable is not disconnected or loose and the metal core is not 
crooked or water-stained etc. 

3.

 

Verify that the cable insulation layer of the conversion cable is not damaged and that the cable is not 
severely folded or bent. 

Assembling the Conversion Cable  

1.

 

Conversion cable installation location: Series’ positive pole is the positive pole of the first component junction box 
cable in the series, and the negative pole is the negative pole of the last component junction box wire in the series. 

2.

 

Plug the positive pole of the array into the negative pole of the conversion cable (compatible) and connect the 
other positive pole (original MC4) of the conversion cable to the DC positive input terminal of the inverter or 
junction box. 

3.

 

Plug the negative pole of the array into the positive pole of the conversion cable(compatible) and link the negative 
pole (original MC4) of the conversion cable to the DC negative input of the inverter or junction box. 

Schematic Diagram is As Follows:

 

 

 

PRECAUTIONS 

 

 

1.

 

After connection, make sure that the polarity of the string matches the polarity between the inverter or the 
combiner box. 

2.

 

While is use, install and connect exactly according to the schematic diagram and do not reverse operation. 

 

3.

 

Each string on the DC side is limited to one pair of conversion lead wires and cannot be exploited to be linked 
multiple times like an extension cord. 

Содержание CRYSTAL PV

Страница 1: ...e 2 Mal k y Sincan Ankara www siriuspv com INSTALLATION MANUAL FOR CRYSTAL PV MODULES TS EN 61215 TS EN 61730 IEC 61215 IEC 61730 IEC 62804 PID FREE ISO 9001 2015 ISO 14001 2015 ISO 45001 2018 ISO 270...

Страница 2: ...n accordance with the instructions given in this Manual or the requirements of the National Electrical Code Installing PV modules requires special skill and information Installation should only be car...

Страница 3: ...e PV modules with broken glass or torn backs with a shock hazard Do not keep PV modules wet unless they have appropriate protection Do not expose the PV module to sunlight until installation to avoid...

Страница 4: ...arranty do not disassemble installed modules for another project Do not install PV modules within 50 m of the shoreline 2 4 FIRE SAFETY The fire rating for this module is valid only if this Manual is...

Страница 5: ...the Northern Hemisphere and in the Southern Hemisphere the modules should typically face north The optimal mounting angle varies with different latitudes and longitudes please consult experts with app...

Страница 6: ...both the long and short side of the module using a minimum of four clamps within the limitations shown in Drawing 2 and 3 The modules are designed to withstand a downward force of up to 5400Pa 550kg m...

Страница 7: ...1665 1650 1640 992 1002 50mm 180 480 5400 50 480 2400 2180 1002 50mm 300 600 5400 50 600 2400 2288 1134 50mm 350 650 5400 2094 1038 50mm 300 600 5400 1996 2015 992 1002 50mm 280 580 5400 50 580 2400 1...

Страница 8: ...C mm D mm Load Pa 1985 1970 1956 992 1002 50mm 50 248 2400 1665 1650 1640 992 1002 50mm 50 248 2400 2180 1002 50mm 50 248 2400 2288 1134 50mm 60 280 2400 1996 2015 2094 992 1002 1038 50mm 50 248 2400...

Страница 9: ...tic and the extremely high temperature of the installation site must be taken into account when calculating Isc value of PV series Please refer to local regulations to identify the size type and tempe...

Страница 10: ...nection Grounding hole is illustrated in Drawing 4 When the system operates in high humidity and high temperature conditions transformer based inverter is highly recommended to reduce the risk of high...

Страница 11: ...Parameters may be updated from time to time please check the correct parameters on our website http www siriuspv com tr http www elinenerji com tr Note Installation Manual is valid until the arrival o...

Страница 12: ...s the positive pole of the first component junction box cable in the series and the negative pole is the negative pole of the last component junction box wire in the series 2 Plug the positive pole of...

Отзывы: