Connection board

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Field installation 
ID 

Name 

Notes 

M1 

Supply voltage 

Depending on model: 24VAC (max current: 6A) or 230VAC 50/60Hz (max current: 0,75A).  

PE (Protection Earth) must be connected.

 

M7 

Auxiliary AC output 

Designed  to  activate  washer  systems.  Generally  activated  via  AUX  2  in  Pelco  D.  The 
activation lasts 5 seconds. 

CN2 

Ethernet 

100base-TX fast Ethernet connection 

 

Pre- or not connected (Not to be changed) 
ID 

Name 

Notes 

M3 

Supply voltage 

Supply voltage for telemetry receiver and any 24VAC device inside the unit. 

M4 

Data input (RS485) 

Reserved.  (Pelco D Protocol to control telemetry receivers: 2400,N,8,1). 

M5 

RS485 bus 

Communication bus (RS485) for telemetry receiver. This provides the auxiliary DC output 
(M7). 

M6 

Auxiliary DC output  Reserved. (12 VDC. Max: 0,4A. Any connection of this Aux must be performed inside the 

base junction box.) 

M8 

Auxiliary AC output 

Auxiliary AC output connected to AUX 2 of telemetry receiver. 

M9 

Auxiliary data 
(RS485) 

Reserved. 

M10 

Auxiliary digital 
input 

Reserved: (Dry contact or open collector auxiliary input. Close IN1 (Collector) to Com IN 
(Emitter) to activate AUX1 (wiper). Close IN2 (Collector) to Com IN (Emitter) to activate 
AUX2 (washer). Com IN=GND.) 

CN1 

Ethernet 

Fast Ethernet to IP camera 

CH1_IN 

Analog input 

Reserved 

CH1_OUT  Analog output 

Reserved 

CN3 

Auxiliary connector 

Reserved 

CN4 

Same as above 

Reserved 

 
 
 

Содержание SA PTZ Series

Страница 1: ...Document name saptzseries_v4 IM EN docx Installation manual SA PTZ Series 316L Fixed camera station...

Страница 2: ...that stated in this manual Although considerable care has been taken to ensure a correct and suitably comprehensive description of all relevant product components this manual may nonetheless contain...

Страница 3: ...ong as the connectors are properly sealed Video and data cables should not share the same conduit with supply voltage cables Whenever EMC is an issue adequately shielded cables must be used Open only...

Страница 4: ...LECTRICAL CONNECTIONS Open the base junction box and perform the connections on the interface board The screw terminal blocks are used for the field installation It must be noted that each plug in con...

Страница 5: ...ocol to control telemetry receivers 2400 N 8 1 M5 RS485 bus Communication bus RS485 for telemetry receiver This provides the auxiliary DC output M7 M6 Auxiliary DC output Reserved 12 VDC Max 0 4A Any...

Страница 6: ...ING THE TELEMETRY RECEIVER The 2 way dip switch on the telemetry receiver DIS2 is used to configure the board to work for pan or for tilt movements When Switch 1 is on OFF 0 the board is configured to...

Страница 7: ...84 switches back this behaviour and make the unit perform the zero axis on startup Calling preset 92 performs a pan and tilt zero axis while call 90 performs a pan zero axis and 91 performs a tilt ze...

Отзывы: