18
First installation
Place the Ecoport 800 in the required location.
Prepare a breakthrough to the outside with a diameter of 100mm.
Mount the ventilation grille for supply air and exhaust air at the opening into the
open air.
Make sure that the distance between the supply air and exhaust air is sufficient so
that the exhaust air is not sucked in again.
Attach the extracted aluminium corrugated pipe with Ø70mm to the exhaust air of
the Ecoport and fix it with the pipe clamp.
Then attach the extracted aluminium corrugated pipe for supply air and exhaust
air with pipe clamps.
Pull all three pipe clamps tight to prevent the aluminium hose from slipping.
Mount the supply and exhaust air grille at the end of the aluminium pipe.
Check the secure hold of the supply air and exhaust system.
Check that the supply and exhaust hoses are free and ensure a safe supply and
exhaust air flow.
IMPORTANT: Observe the safety instructions in this operating manual during instal
-
lation. If other lengths of the exhaust system are required, contact Siqens technical
support.
1.
Connecting the Ecoport Exhaust System
Содержание Ecoport 800
Страница 1: ...Quick Installation Ecoport 800 Safe power anywhere...
Страница 2: ...2...
Страница 11: ...11 Ecoport 800...
Страница 15: ...15 Front view 420 341 5 350...
Страница 27: ...27 Ecoport 800 Now the Ecoport 800 must be started manually 10 Initial Start of the Ecoport 800...
Страница 31: ...31 Notes Ecoport 800...