
Page 9
Figure 3. Dumo connection possibilities
6. MAINTENANCE
Dumo is designed so that only a very little maintenance is needed. However,
the user should clean the measurement channel after some period of time.
The cleaning period varies, depending on monitoring conditions and dust
concentrations. The user should check the channel frequently.
EASTERN ENERGY SERVICES PTE LTD.
60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore
Telephone: +65-6748 6911 Fax: +65-6748 6912
Email: [email protected] Website:
www.eesgroup.com