8.0 INSTALLATION
8.1 Packing
Case
SCS2ENMD48’s packing case contains:
the energy station;
battery and load fuses;
this instruction manual.
ATTENTION:
The energy stations are very fragile electronic devices. Be very careful when unpacking and
transporting.
8.2 Preliminary
Controls
Before proceeding with the installation of SCS2ENMD48, check if the device has been damaged during delivery. The
energy station should be placed in a well ventilated room, far from any sources of heat and the parts which require
ventilation should not be obstructed.
8.3
Installation / Switching ON
The following installation procedures must be carried out when the energy station is switched on for the first time:
For a correct installation proceed with the following operations:
1)
Connect the powering user cable to the corresponding terminals, as the Figure 4:
Figure 4
Linea Monofase 230VAC (1F+N)
Linea Trifase 400VAC(3F+N)
NOTE :
The connection of the three phase line input is only possible with the 3 power supplies installed and operating.
2)
Switch on ENERGY by turning the switch to the “I” position to all modules; the leds of the modules will light up,
and after few second the red led "ALARM" turns off and the LED green "POWER" remains access fixed.
At this point the energy station is turned on. The “MAIN SUPPLY” green led will light up on the synoptic panel
and the display will show:
STARTUP
| | | | | | | ---------------
3)
At the end of the ignition the display
SYSTEM OK
V = 54.00 I = xx,xA
4) Switch ON the circuit breakers, situated on the front of synoptic panel .
5)
Simulate a black-out by disconnecting the main power;
The “BATTERY MODE” red led will light up on the synoptic panel and the following will appear on the display:
BATTERY MODE
This state of operation is accompanied by an intermittent acoustic signal (10 sec.);
6)
Re-insert the main supply. The energy station is now in a normal functioning state and the display will indicate:
SYSTEM OK
V = 54.00 I = xx,xA
7)
The energy station is now operative.