2
4
Fig.4
Install the indoor unit
1.When routing the piping and wiring from the left or right side of the indoor
unit, cut off the tailings from the chassis in necessary(shown in Fig.
5
).
Cut off tailing 1 when only power cord is routed.
Cut off tailings 1 and 2 when connect pipe and power cord are routed.
2.Wrap the piping and wiring and pull them through the cut-off tailings hole
(shown in Fig.
6
).
3.Hang the 2 mounting slots of the indoor unit on the upper tabs of the rear panel
and check if it is firm enough.
4.The height of the installed location should be 2.3m or more from the floor.
NOTE:
All the electrical work must be done by qualified personnel according to relative wiring regulation and this
manual.
The power supply is type Y connection. If the supply cord is damaged, it must be replaced by the manufacturer or
its service agent or a similarly qualified person in order to avoid a hazard.
The rated voltage and the exclusive circuit must be used.
Leakage circuit-breaker and air switch of correct capacity must be installed. The air switch of
32
A should be
used in these models.
Содержание ASH-28AT
Страница 1: ...USER S MANUAL ASH 28AT TITAN SERIES ...
Страница 2: ......