
29
The distance of the foundation bolt is shown in Fig-17.
762
676
Fig-17
2.3 Convey Outdoor Unit
Use 4 steel ropes of a Ф6mm or bigger size to hoist the outdoor unit and convey it into the room.
In order to prevent scratch and deformity the outdoor unit, apply a guard board to the surface of contact
between the steel ropes and the air conditioner.
Remove the cushion for use in the transport after finishing the transport. (Fig-18)
Fork truck can be used for conveying.
Steel wire
Guard board
Base and bracket
Holes for fork truck
Fig-18
2.4 Snow protection facilities must be installed in the snowfall areas. (Fig-19)
In case the snow protection facilities are incomplete, faults may occur. In order to prevent influence
caused by snow, set up raised pavilion, and install snow protection sheds at the air inlet and air outlet.
Содержание ASE-120AH
Страница 1: ...SERVICE MANUAL ASE 76AH ASE 96AH ASE 120AH CONDENSING UNITS ...
Страница 2: ......
Страница 11: ...8 2 Dimension Units mm 2 1 ASE 76AH ASE 96AH ...
Страница 12: ...9 2 2 ASE 120AH ...
Страница 14: ...11 Foundation of the outdoor unit 762 676 500 mm 500 mm M12 foundation bolt 4 screws for 1 unit ...
Страница 18: ...15 8 1 ASE 76AH 8 Exploded View ...
Страница 20: ...17 8 2 ASE 96AH ...
Страница 22: ...19 8 3 ASE AH ...
Страница 46: ...43 6 1 1 Duct type 76 kBtu h 96 kBtu h 120 kBtu h 6 1 2 Floor standing type 76 kBtu h 96 kBtu h ...
Страница 51: ...48 ...
Страница 52: ...49 Part 4 Control 1 Central Control Monitor Optional 50 ...
Страница 53: ...50 1 HQWUDO RQWURO 0RQLWRU 2SWLRQDO 0 1 2YHUYLHZ XWWRQV DQG XQFWLRQV ...
Страница 54: ...51 Liquid Crystal Display ...