![Sinclair ASC-60AN Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/sinclair/asc-60an/asc-60an_service-manual_1280118055.webp)
Additional refrigerant charge
1. When conduct first vacuum drying, connect pressure gauge to the infusing mouth of gas pipe and liquid
pipe, and keep vacuum pump running for 1hour (vacuum degree of vacuum pump shall be reached
-755mmHg).
2 If the vacuum degree of vacuum pump could not reach -755mmHg after 1 hour of drying, it indicates
that there is moisture or leakage in pipeline system and need to go on with drying for half an hour.
3 If the vacuum degree of vacuum pump still could not reach -755mmHg after 1.5 hours of drying, check
whether there is leakage source.
4 Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the pressure
for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it indicates that
there is moisture or leak source.
7.3.2 Special vacuum drying
The special vacuum drying method shall be adopted when:
1. Finding moisture during flushing refrigerant pipe.
2. Conducting construction on rainy day, because rain water might penetrated into pipeline.
3. Construction period is long, and rain water might penetrated into pipeline.
4. Rain water might penetrate into pipeline during construction.
Procedures of special vacuum drying are as follows:
1. Vacuum drying for 1 hour.
2. Vacuum damage, filling nitrogen to reach 0.5Kgf/cm2 .
Because nitrogen is dry gas, vacuum damage could achieve the effect of vacuum drying, but this
method could not achieve drying thoroughly when there is too much moisture. Therefore, special
attention shall be drawn to prevent the entering of water and the formation of condensate water.
3. Vacuum drying again for half an hour.
If the pressure reached -755mmHg, start to pressure leakage test. If it cannot reached the value,
repeat vacuum damage and vacuum drying again for 1 hour.
4 Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the pressure
for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it indicates that
there is moisture or leak source.
8. Additional refrigerant charge
¾
After the vacuum drying process is carried out, the additional refrigerant charge process need to be
performed.
¾
The outdoor unit is factory charged with refrigerant. The additional refrigerant charge volume is decided
by the diameter and length of the liquid pipe between indoor and outdoor unit. Refer the following
formula to calculate the charge volume.
Diameter of liquid pipe (mm)
ĭ
6.35
ĭ
9.52
ĭ
12.7
Formula
V=11g/m×(L-5)
V=30g/m×(L-5)
V=60g/m×(L-5)
V:
Additional refrigerant charge volume (g).
L :
The length of the liquid pipe (m).
Note:
¾
Refrigerant may only be charged after performed the vacuum drying process.
¾
Always use gloves and glasses to protect your hands and eyes during the charge work.
¾
Use electronic scale or fluid infusion apparatus to weight refrigerant to be recharged.
Be sure to avoid
extra refrigerant charged, it may cause liquid hammer of the compressor or protections.
¾
Use supplementing flexible pipe to connect refrigerant cylinder, pressure gauge and outdoor unit. And
The refrigerant should be charged in liquid state. Before recharging, The air in the flexible pipe and
manifold gauge should be exhausted.
¾
After finished refrigerant recharge process, check whether there is refrigerant leakage at the connection
joint part.(Using gas leakage detector or soap water to detect).
50
Содержание ASC-60AN
Страница 1: ...SERVICE MANUAL ASF 60AN ASC 60AN ON OFF SERIES ...
Страница 2: ......
Страница 8: ...Indoor Units Indoor Units Super slim Cassette Type 4 Ceiling Floor Type 17 3 ...
Страница 14: ...Dimensions 2 Dimensions Model A H ASC 60AN 287 317 9 ...
Страница 15: ...Service Space 3 Service Space 1000mm 1000mm 1000mm 1000m m 10 ...
Страница 16: ...Wiring Diagrams 4 Wiring Diagrams ASC 60AN 11 ...
Страница 18: ...Sound Levels 6 Sound Levels P Microphone Model Noise level dB A H M L ASC 60AN 55 50 47 13 ...
Страница 21: ...Field Wiring 9 Field Wiring ASC 60AN 16 ...
Страница 24: ...Dimensions 2 Dimensions Capacity Btu h A B C D E ASF 60AN 1650 675 235 1565 220 19 ...
Страница 25: ...Service Space 3 Service Space 20 ...
Страница 26: ...Wiring Diagrams 4 Wiring Diagrams ASF 60AN 21 ...
Страница 29: ...Field Wiring 9 Field Wiring ASF 60AN 24 ...
Страница 31: ...Dimensions 1 Dimensions Model Unitφmm A B C D E F H 938 633 5 404 448 370 392 1369 ASF 60AN ASC 60AN 26 ...
Страница 34: ...Wiring Diagrams 4 Wiring Diagrams ASF 60AN ASC 60AN 29 ...
Страница 76: ...Troubleshooting f Indoor fan speed has been out of control Eb 71 ...
Страница 79: ...Troubleshooting c Up down panel is not closed 74 ...
Страница 91: ...MODEL ASC 60AN intdoor ...
Страница 93: ...Model ASF 60AN indoor ...
Страница 95: ...MODEL ASC 60AN ASF 60AN outdoor ...