![Simrad PI Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/simrad/pi/pi_installation-manual_1278767032.webp)
Simrad PI Catch monitoring system / Trawl hydrophone
26
851--164472 / Rev.B
Location and marking
After installation, the location of hydrophones should be clearly
marked on the vessel’s hull (above the water-line) directly over
them. This information will help prevent hydrophone damage
when dry-docking the vessel. It is very important to amend the
docking-plans of larger vessels to also reflect this information so
that blocks will not be placed in the vicinity of hydrophones,
fins, deflection plates or other associated appendages.
After installation / Sea trials
Once the installation is complete and the vessel afloat, the
system’s performance should be documented. Refer to the
appropriate section in the PI Operation manual regarding the
measurement of a noise vs. speed curve.
Содержание PI
Страница 2: ......
Страница 3: ...851 164472 Rev B Simrad PI Catch monitoring system Trawl hydrophone installation ...
Страница 6: ...Simrad PI Catch monitoring system Trawl hydrophone IV 851 164472 Rev B ...
Страница 39: ...Installation manual 33 851 164472 Rev B PI Trawl hydrophone Outline dimensions ...
Страница 40: ...Simrad PI Catch monitoring system Trawl hydrophone 34 851 164472 Rev B PI Trawl hydrophone Cut out Page 1 ...
Страница 41: ...Installation manual 35 851 164472 Rev B PI Trawl hydrophone Cut out Page 2 ...
Страница 43: ...Installation manual 37 851 164472 Rev B PI Trawl hydrophone Mounting flange Page 2 ...
Страница 45: ...Installation manual 39 851 164472 Rev B PI Trawl hydrophone in blister Arrangement drawing Page 2 ...
Страница 47: ...Installation manual 41 851 164472 Rev B PI Trawl hydrophone in keel mounted shoes Arrangement drawing Page 2 ...
Страница 48: ...E 2005 Simrad AS ISBN 82 8066 055 0 ...