To operate
the
LED lights
,
press the rocker switch located on the crank housing on
or
off.
NOTE:
a)
The
Finial (
D
)
contains
two
lithium batteries (2 x 2200mAh).
Press
the switch
to
the
off
position during
day
light
to allow
the
s
olar
p
anel
to
charge the batteries.
Charging time is dependent on the amount of sunlight
,
however,
8
hours is recommended.
b)
The
batteries can also be charged using the 100
V
~
240V
AC
Adapter (
E
)
by plugging it into the crank housing
as shown
in the illustration
. Charging time is approximately
5 - 6
hours.
c)
If the batteries
are dead
, the lights
will
operate with the
AC Adapter (E)
plugged in. The r
ed light on the
AC
Adapter (
E
)
indicates power
is present
.
d)
Keep
the
u
mbrella unplugged and the
AC
Adapter (
E
)
stored in a dry location when not in use.
5
On/Off Switch
100
V
~240V
AC
E
5
OPERATION
OVERVIEW
D