Simplicity 10 LE Series Скачать руководство пользователя страница 2

KEY 
SYMBOL 

KEY DESCRIPTION 

 

 

LOOK 

 

 

THINK / CHOOSE? 

 

THIS SECTION  

RELATES TO ANOTHER 

(e.g. 1 to 5) 

 

 

CORRECT 

 

 

DO NOT FIX DOWN! 

 

 

TWIST TO LOCK 

 

 

TIGHTEN 

 

 

DO NOT WET! 

Thank you for purchasing your new Simplicity greenhouse. We recommend you familiarise yourself with the instructions and read all safety 
information before you commence assembly.  This instruction manual is also available online at 

www.greenhousepeople.co.uk

 in our technical 

help section should you need to reprint it.  Should you require any additional advice you can always call us on 01782 388811. 
 

These instructions are divided into sections; 

B

-base, 

partlists

,

1

-sides, 

2

-front gable, 

3

-rear, 

4

-joining the four sides together, 

5

-roof, 

6

-vent, 

7

-door,        

8

-glazing(

8a

 horticultural glass, 

8b

 toughened glass, 

8c

 polycarbonate glazing when available), 

9

-vent attachment, 

10

-door attachment, 

11

 anchoring 

down, 

back cover

-packing list.  If you need to contact us for assistance please refer to the relevant section/s. 

 

Safety Warning

 



Glass and aluminium can potentially cause injury. Please ensure you wear protective goggles, gloves, headgear and suitable footwear when 
assembling and glazing the building. 



Please remember that glass is fragile and should be handled with extreme care. Always clear up and dispose of any breakages immediately. 



Do not assemble the greenhouse in high winds. 



For safety reasons and ease of assembly, we recommend that this greenhouse is assembled by a minimum of two people.  



Please clear all lying snow from the greenhouse roof as it can cause the roof to buckle or collapse. 

 

Site Preparation

 



When selecting a site for your greenhouse, it is vital that you choose as flat and level an area as possible.  



A concrete or slabbed base will provide the most solid foundation for your greenhouse.   



IMPORTANT: Do 

not

 fix your building down until the building is fully assembled, including glazing.   



Avoid placing your greenhouse under trees or in other vulnerable locations. 



To minimise the risk of wind damage, try to select as sheltered a site as possible, e.g. beside a hedgerow or garden fence. 

 

Additional Considerations

 



Please bear in mind that assembling your greenhouse can be time consuming. You may need to spread the construction over two or more 
days. We recommend that you avoid leaving the building partially glazed.  If you ever have to leave your greenhouse half assembled and not 
anchored down, weigh it down with slabs or bags of sand to stop the wind moving it. 



You will find it helpful to prepare a large, clean and clear area in which to work in. A garage floor or flat lawn area is ideal. 



If you have arranged for someone to install your greenhouse for you, please check that all components are included. Most parts are numbered 
and can be identified by a stamp or removable label. Alternatively, the components can be identified by lengths detailed in the packing list (see 
diagram below). 



Anchoring down your greenhouse should be the final stage of construction (including glazing).  



Once installed your greenhouse requires little maintenance, but to maintain the smooth running of your door(s) WD40 or similar can be applied 
to the door wheels and lower door guides.  

 

Guarantee

 



Your new Simplicity greenhouse is guaranteed for 10 years against faulty manufacture of the framework. This does not include glazing, moving 
parts, accidental damage or wind damage. 

610mm 

121 

Содержание 10 LE Series

Страница 1: ...A mm B mm 3150 10 4 x 6 3 1910 10 4 x 8 3 2530 10 4 x 10 4 3150 10 4 x 12 4 3770 R A N G E ...

Страница 2: ...ecting a site for your greenhouse it is vital that you choose as flat and level an area as possible A concrete or slabbed base will provide the most solid foundation for your greenhouse IMPORTANT Do not fix your building down until the building is fully assembled including glazing Avoid placing your greenhouse under trees or in other vulnerable locations To minimise the risk of wind damage try to ...

Страница 3: ...OPTION 1 base on grass OPTION 2 base on slabs OPTION 3 base on concrete OPTION 4 no base on brick A mm B mm 3150 10 4 x 6 3 1910 10 4 x 8 3 2530 10 4 x 10 4 3150 10 4 x 12 4 3770 ...

Страница 4: ...4 183 3096 1 2 4 10 2488 1 300 n a 12 14 16 18 1 3720 2 5 3100 2 17 2480 2 25 1860 2 3 3720 2 8 3100 2 14 2480 2 27 1860 2 49 1314 4 32 1210 4 6 8 10 2 3720 1 6 3100 1 12 2480 1 26 1860 1 188 1866 4 6 8 10 187 1920 4 93 636 1 2 3 4 601 608 4 6 8 10 602 900 2 3 4 5 184 3096 1 36 1857 2 38 2 70 1538 2 71 2 186 2269 1 191 480 1 189 1855 2 190 2 30 1210 2 31 2 ...

Страница 5: ...10 8 10 10 10 12 10mm M4 M6 121 612 1 2 3 4 123 612 1 2 3 4 124 610 2 4 6 8 1 2 3 4 2 4 6 8 6 12 18 24 2 4 6 8 130 619 41 a 1763 1 41 1763 3 95 614 2 137 883 4 4 4 4 4000 1 8 167 300 380 2 2 2 234 266 298 330 108 126 144 162 6 roll 7 roll 8 roll 9 roll 161 173 185 197 171 185 199 213 8 M6 CROP M6 M6 ...

Страница 6: ...M6 28 Part No mm Quantity 14 2480 2 32 1210 6 17 2480 2 49 1314 4 M6 22 M6 22 Part No mm Quantity 27 1860 2 32 1210 4 25 1860 2 49 1314 4 M6 16 M6 16 Part No mm Quantity 3 3720 2 32 1210 10 1 3720 2 49 1314 4 M6 34 M6 34 6 8 10 12 27 25 14 17 8 5 3 1 X 2 X 2 X 2 X 2 ...

Страница 7: ...49 32 32 ...

Страница 8: ... 36 1857 1 38 1857 1 51 1480 2 70 1538 1 Part No mm Quantity 71 1538 1 136 924 2 184 3096 1 189 1855 1 190 1855 1 191 480 1 38 38 M6 2 1 184 36 38 51 30 31 136 189 190 136 51 70 71 136 51 191 This bar is currently riveted to the door track assembly 10 ...

Страница 9: ...184 51 36 38 184 30 31 189 190 51 136 30 31 189 190 191 36 38 189 190 10 10 161 This bar is currently riveted to the door track assembly 10 ...

Страница 10: ...1210 1 31 1210 1 36 1857 1 38 1857 1 51 1480 2 70 1538 1 71 1538 1 183 3096 1 185 3076 1 Part No mm Quantity 186 2269 1 189 1855 1 190 1855 1 197 2190 2 45 45 M6 2 1 183 36 38 51 30 31 189 190 185 51 70 71 186 197 197 51 185 ...

Страница 11: ...36 38 189 190 183 30 31 183 51 36 38 185 189 190 186 189 190 30 31 51 185 197 189 190 ...

Страница 12: ...This bar is currently riveted to the door track assembly 10 Please ignore at this stage Part 10 fitted in section 10 ...

Страница 13: ... Drill centrally between two vertical glazing bars for neatness it is not essential to drill every section Make sure the bolt head does NOT interfere with the line of the glass Cills should be drilled 18mm from the inside vertical face to avoid the front glass face Do NOT anchor the structure to the ground until the end Packed with base M6 CROP ...

Страница 14: ... No mm Quantity 12 2480 1 93 636 2 187 1920 4 188 1866 6 601 608 6 602 900 3 32 6 Part No mm Quantity 26 1860 1 93 636 1 187 1920 4 188 1866 4 601 608 4 602 900 2 22 1 2 1 2 3 4 4 188 3 187 187 188 188 187 49 ...

Страница 15: ...12 Part No mm Quantity 2 3720 1 93 636 4 187 1920 4 188 1866 10 601 608 10 602 900 5 52 10 Part No mm Quantity 6 3100 1 93 636 3 187 1920 4 188 1866 8 601 608 8 602 900 4 42 X 2 M4 X 4 602 601 93 ...

Страница 16: ...124 121 121 124 610 x 610 M6 10mm X 2 X 2 X 4 M4 X 2 M4 X 2 X 4 or OPTIONAL CAPPING X 1 1220mm Part No mm Quantity 121 612 1 123 612 1 124 610 2 ...

Страница 17: ...123 610 x 610 ...

Страница 18: ...Part No mm Quantity 41 1763 3 95 614 2 41a 1763 1 130 619 8 137 883 4 130 95 41 41a 41 41 130 95 130 137 137 130 130 130 FLUFF FLUFF M6 32 32 M6 X 4 X 2 7 6 m FLUFF 4 m X 4 X 4 ...

Страница 19: ...41 41 41a 41 Please note that you may need to change the orientation of the diagonal flat bar braces in your door s to make fitting your door stop easier i e the diagonals can be fitted in either orientation FLUFF ...

Страница 20: ......

Страница 21: ... R 610 X 1280 6 8 10 12 A 610 X 610 12 14 16 18 G 457 X 1197 8 H 610 X 363 2 610mm 12 R S S S S A A R G G S A 610 x 610 1 D 610 x 153 1 L 573 x 100 5 A A H R G G X X Y z Y G G X X 30 X 340 457 457 Y 657 347 A A A H A A z S V V A A V 44 610 464 Z 610 80 495 ...

Страница 22: ...10 X 610 28 34 40 46 B 610 X 457 28 32 36 40 C 610 X 386 6 8 10 12 H 610 X 363 2 P 457 X 87 4 D 610 x 153 1 L 573 x 100 5 D L A H E B B B B B B B B B X X P P 30 X 340 457 457 E 580 270 D 64 610 486 Z 610 80 495 E A D E A B A B B B X X P P A D A B A B B B Z A A H C C C C C ...

Страница 23: ...123 85 93 85 93 85 93 85 93 ...

Страница 24: ...oor rear and attach door stop handles see diagrams below Re attach the nuts Attach upper door track 10 to the two bolts left ready in section 2 with nuts position 10 vertically and push it through the central section between the two glaze bars Twist 10 so that the slots in the mounting bar are facing upwards Slide doors into upper track 10 and lower track 184 adjust the height of 10 until the door...

Страница 25: ...SAND O7mm No 10 x 2 Please note you will have to drill and screw through your metal base and into your solid foundation at an angle from outside the building ...

Страница 26: ...nice if we can include real greenhouse photos in the brochure so if you send us a photo of your greenhouse to us and it is good enough to get into our next brochure we will send you a 25 reward Please send your photos to Photo competition Simplicity Greenhouses Blythe Park Cresswell Stoke on Trent Staffs ST11 9RD 01782 398600 Or better still email us on sales simplicitygreenhouses co uk Please wri...

Страница 27: ... is a good idea to use a transparent all weather silicone inside and outside of the building where there are any gaps Also the top of the vents can be siliconed Vent top corner siliconed along with bar capping Inside eave area siliconed ...

Страница 28: ...900 2 3 4 5 1 2 3 4 6 7 8 9 4m 4m 4m 4m 1 smalls pack for correct size of building BOX PACKED BY No mm 6 8 10 12 1 3720 2 2 3720 1 3 3720 2 5 3100 2 6 3100 1 8 3100 2 10 2488 1 1 1 1 12 2480 1 14 2480 2 17 2480 2 25 1860 2 26 1860 1 27 1860 2 30 1210 2 2 2 2 31 1210 2 2 2 2 32 1210 4 6 8 10 36 1857 2 2 2 2 38 1857 2 2 2 2 41 1763 3 3 3 3 41a 1763 1 1 1 1 49 1314 4 4 4 4 51 1480 4 4 4 4 70 1538 2 2...

Отзывы: