36
10 Maintenance
1. All maintenance work on the machine, as well as inspections and cleaning, must be carried
out with the machine detached from the prime mover and positioned on the ground (for
designated worker, see the maintenance schedule);
2. Maintenance operations must be carried out in a suitable place, in compliance with the
safety regulations in force;
3. Clean all the machine's parts thoroughly before beginning any maintenance work on it (see
para.10.4);
4.
Appropriate personal protection equipment must be used throughout maintenance.
Routine Maintenance Schedule
Maintenance
interval
Operation
Procedure
Designated
worker
EVERY HOUR
•
TOOL INTEGRITY ASSESSMENT
Para.10.2
OPERATOR
•
DRUM INTEGRITY INSPECTION
Para.10.1
EVERY 50
HOURS
•
MACHINE CLEANING
Para.10.4
OPERATOR
•
LUBRICATE THE DEPTH ADJUSTMENT
MECHANISM AND SPRING JACK
Para.10.8
Para.10.9
Para.10.10
•
HOSE INSPECTION
Para.10.11
EVERY 100
HOURS
•
STRUCTURAL INTEGRITY ASSESSMENT
Para.10.5
OPERATOR
•
NUT AND BOLT TIGHTNESS TEST
Para.10.6
EVERY 200
HOURS
•
CHECK THE SUPPORT SKIDS FOR WEAR
Para.10.7
OPERATOR
During machine maintenance, if you are in any doubt as to the parts required or complicated work is
needed, contact your authorised dealer.
All load handling operations must be carried out in compliance with the regulations in force
concerning safety in the workplace.
Содержание PL 4520
Страница 14: ...14...
Страница 60: ...60 IMPORTER...