36
5 INSTALLATION
m
CAUTION
The appliance must only be installed by the
Sime Ltd
Technical Service or by qualified professionals
who
MUST wear
suitable protective safety equipment.
5.1
Receiving the product
Murelle Revolution 30
is delivered in a single unit protected by
cardboard packaging.
Fig. 48
The plastic bag found inside the packaging contains the follow-
ing:
– Installation, use and maintenance manual
– Certificate of warranty
– Hydrostatic test certificate
– Hanging Bracket
– External sensor
– Main control panel (remote)
– Connection pack
– Boiler and heat pump energy labels
– Anti-vibration and spacer panels
– Paper template for boiler installation.
d
DO NOT
Do not leave packaging material around or near chil-
dren since it could be dangerous. Dispose of it as pre-
scribed by legislation in force.
5.2
Dimensions and weight
Description
Murelle Revolution 30
W (mm)
600
D (mm)
391
H (mm)
900
H1 (mm)
82,5
H2 (mm)
71
Weight (kg)
103
H1
H
H2
L
P
Fig. 49
5.3
Handling
During transportation, the boiler must be kept in a vertical po-
sition, and knocks against walls or hard surfaces should be
avoided.
d
DO NOT
Position the appliance horizontally or on its side.
YES
NO
NO
Fig. 50