Sime 2R HE 10 ErP Скачать руководство пользователя страница 11

34

the  presence  of  voltage.The  burner 
will start.

3.2.2  Boiler stat (fig. 8)

Turn the boiler stat knob to a tempera-
ture no lower than 60°C. 
The  set  temperature  value  can  be 
checked on the thermometer.

3.2.3  Safety stat (fig. 9)

The  manually  reset  safety  stat  trips  to 
switch-off the burners immediately when 
the  boiler  temperature  exceeds  100°C. 
To restart the boiler, unscrew the black 
cover and press the button underneath. 

If the problem occurs frequently, call an 
authorised  technical  assistance  centre 
for  the  necessary  checks  to  be  carried 
out.

3.2.4  System filling

Periodically  check  the  pressure  values 
of  the  hydrometer  mounted  onto  the 
system, when the system is cold, should 
range  between  1  and  1.2  bar  (98  and 
117.6 kPa). 
If the pressure is less than 1 bar (98 kPa), 
reset the system.

3.2.5  Turnig OFF boiler (fig. 7)

To  temporarily  turn  off  the  boiler  turn 
off the electricity supply by pressing the 
main switch. 
The following operations must be carried 
out  if  the  plant  will  not  be  in  use  for  a 
lengthy period of time:
–  position the main switch of the plant on off;
–  turn the fuel and water taps of the cen-

tral heating plant off;

–  empty the central heating plant if there 

is danger of frost:

3.2.6 

Second stage modulation 

 

thermostat (fig. 10)

The thermostat (TC2) is factory set at 50°C. 
To access calibration, remove the protecti-
ve plug and act with a suitable screwdriver. 
The purpose of the thermostat is to switch 
the  burner  to  minimum  power  (second 
stage).

3.3  

REGULAR CLEANING

Maintenance  of  the  boiler  should  be  
carried  out  annually  by  an  authorised 
service engineer. 
Disconnect  the  boiler  from  the  electri-
cal  supply  before  servicing  or  mainte-
nance is carried out.

Fig. 8

Fig. 9

60°C

60°C

TC2

Fig. 10

Содержание 2R HE 10 ErP

Страница 1: ...TIONS ORIGINALES ORIGINALANLEITUNG ORIGINALANWEISUNGEN INSTRUCȚIUNI ORIGINALE ΑΡΧΙΚΕΣ ΟΔΗΓΙΕΣ Gentile Cliente metta in funzione la sua nuova caldaia entro 30gg dalla data di installazione da personale professionalmente qualificato Potrà così beneficiare sia della garanzia legale sia della garanzia convenzionale Sime che trova alla fine di questo manuale NL DE RO GR IT ES ENG FR ...

Страница 2: ...2 5 ELECTRICAL CONNECTION 3 USE AND MAINTENANCE 3 1 COMMISSIONING THE BOILER 33 3 2 LIGHTING AND OPERATION 3 3 REGULAR CLEANING 34 3 4 FROST POTECTION 35 3 5 POWER CABLE 3 6 DISPOSAL OF THE EQUIPMENT 2R HE ErP ENGLISH CONFORMITY Our Company declares that 2R HE ErP boilers comply with the essential requirements of the following directives Boiler Efficiency Directive 92 42 EC Ecodesign Directive 200...

Страница 3: ... INPUT MAX HEAT OUTPUT MAX MAX OPERATING PRESSURE CONTENTS D H W HEAT INPUT MAX D H W MAX OPERATING PRESSURE D H W D H W FLOW RATE POWER SUPPLY MAX POWER ABSORBED TYPE CODE DIRECTIVE OF REFERENCE PIN NUMBER MAX OPERATING PRESSURE MAX OPERATING PRESSURE D H W 1 2 1 Technical data plate fig 2 Fig 2 2R HE 6 ErP 7 ErP 8 ErP 9 ErP 10 ErP 11 ErP 12 ErP 13 ErP L Depth mm 1232 1355 1478 1601 1724 1847 197...

Страница 4: ...392 4 392 Water content l 74 2 84 3 94 9 105 5 116 1 126 7 137 4 147 9 Smokes loss of head mbar kPa 0 35 0 034 0 45 0 044 0 50 0 049 0 55 0 054 0 65 0 064 0 75 0 073 0 85 0 083 0 90 0 088 Combustion chamber pressure mbar kPa 0 42 0 041 0 55 0 054 0 65 0 064 0 75 0 073 0 85 0 083 1 10 0 108 1 49 0 146 1 56 0 153 Suggested chimney depression mbar kPa 0 15 0 015 0 15 0 015 0 15 0 015 0 15 0 015 0 15 ...

Страница 5: ...ta 1 5 1 Burners assembly fig 4 The boiler door details is shown in figure 3 a for burner mounting The burners must be regulated such that the CO2 value is that indicated in point 1 3 with a tolerance of 5 28 Fig 4 C A B 2R HE A B C mm mm ø 6 ErP 130 170 M8 7 ErP 130 170 M8 8 ErP 130 170 M8 9 ErP 130 170 M8 10 ErP 160 190 M10 11 ErP 160 190 M10 12 ErP 160 190 M10 13 ErP 160 190 M10 1 5 2 Permanent...

Страница 6: ... rear insulation panel 4 fasten the lower cross beam 3 to the cast iron body with two hex head screws fasten the sides 5 6 to the supports 1 with four self tapping screws and lock them in the back using nuts inser ted on the tie rods install the upper rear panel 7 8 with the four self tapping screws supplied fasten the control panel 9 to the corners 2 with the four self tapping screws supplied unw...

Страница 7: ...30 4 x 4 x 5 x 4 x 2 x 13 17 16 18 19 6 x 20 14 15 15 7 8 7 8 13 15 15 20 19 5 6 11 21 21 4 Fig 5 b ...

Страница 8: ...pan sion vessel with a capacity of 8 litres and a maximum pressure of 8 bar 784 kPa The tank should be of the membrane type made of natural rubber caou tchouc which is suitable for foods 2 4 CONNECTING UP FLUE The flue is of fundamental importance for the proper operation of the boiler if not installed in compliance with the stand ards starting the boiler will be difficult and there will be a cons...

Страница 9: ...rner optional B1 Permanent feeding dual level burner optional B2 Direct feeding Burner TA Room stat OP Programmer s clock NO TE When a room stat TA is to be fitted remove the link between terminal 4 and 5 on the connector plug To connect the programmer s clock OP remove the link between terminals 5 and 6 NOTE The brown capped off cable and black capped off cable has to be exclusively used in case ...

Страница 10: ...to confirm 3 USE AND MAINTENANCE WARNINGS In case of failure or malfunction of the equipment contact authorised technical staff For safety reasons the User cannot access the internal parts of the appliance All operations involving the removal of protections or otherwise the access to dan gerous parts of the appliance must be performed by qualified personnel The appliance can be used by children un...

Страница 11: ...less than 1 bar 98 kPa reset the system 3 2 5 Turnig OFF boiler fig 7 To temporarily turn off the boiler turn off the electricity supply by pressing the main switch The following operations must be carried out if the plant will not be in use for a lengthy period of time position the main switch of the plant on off turn the fuel and water taps of the cen tral heating plant off empty the central hea...

Страница 12: ...n the appliance and the relevant list of actions required A working fault in most cases provo cates the lock out signal onto the con trol panel of the control box When this light turns on the burner can operate again only after the reset button has been pressed if this has been done and a regular ignition occurs it means the failure can be defined momentary and not dangerous On the contrary if the...

Страница 13: ... of the flue ducts door combustion chamber smoke ducts flue washers Control the quality of the fuel Frequent intervention of the boiler shutoff valve Control the presence of air in the system the function of the circulation pumps Check the load pressure of the appli ance the efficiency of the expansion tanks and the valve calibration 3 4 FROST PROTECTION In the event of frost ensure that the centr...

Страница 14: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it Documentation Dpt Fonderie Sime S p A ...

Отзывы: