background image

 

007-6442-002

Replacing a BaseIO Card in an SGI® UV™ 300H Server

1

...............................................................................................................................................................................

Replacing a BaseIO Card in an SGI

® 

UV

™ 

300H Server

A video of this procedure is available.

After troubleshooting and verifying the symptoms of a BaseIO card failure, complete the following 
procedure to prepare the system for BaseIO replacement, remove the faulty BaseIO card, install the 
new card, and return the system to operational status.

BaseIO Card Failure Symptoms

The following symptoms may indicate BaseIO card failures:

eth0 is not available.

eth0 performance is degraded.

USB ports are not available.

Boot drives are not accessible.

System does not boot.

Safety Precautions

A fully-loaded chassis weighs approximately 125 pounds. Do not attempt to remove a chassis from 
the rack by yourself.

You do not need to completely remove the chassis from the rack to replace a BaseIO card. Slide the 
chassis out the front of the rack until the safety locks engage at the halfway point to keep the chassis 
in place. Then, remove the front top cover to access parts for replacement.

Be sure to observe all ESD, electrical, and safety precautions when you perform the BaseIO card 
replacement procedure. For more information, refer to the 

SGI UV 300 System User Guide

, SGI 

publication number 007-6351-00x.

Component

Part Number

CRU/FRU

Hot Swappable?

Access Position

BaseIO Card

030-2929-00x

CRU

No

Slid Forward

Содержание UV 300H

Страница 1: ...ves are not accessible System does not boot Safety Precautions A fully loaded chassis weighs approximately 125 pounds Do not attempt to remove a chassis from the rack by yourself You do not need to completely remove the chassis from the rack to replace a BaseIO card Slide the chassis out the front of the rack until the safety locks engage at the halfway point to keep the chassis in place Then remo...

Страница 2: ... and other cables from the front of the chassis c Remove the power cables from the rear of the chassis BaseIO Card Replacement Procedure Removing a BaseIO Card 1 Grasp the handles and slide the chassis out the front of the rack until the chassis locks in place 2 Remove the T10 TORX screws that secure the front top cover to the chassis 3 Slide the cover toward the front of the chassis and lift off ...

Страница 3: ...front of the chassis 8 Replace the bezel 9 Reconnect the power cables on the rear of the chassis After BaseIO Card Replacement Complete the following steps to return the system to operational 1 Connect power to the system 2 Run the nl7cfg utility from the RMC to verify cabling rmc nl7cfg Recable and run the utility again if necessary 3 Have the customer boot the operating system 4 Modify the etc u...

Страница 4: ...lowing steps to configure the replacement BaseIO card 1 Configure eth0 with the proper static IP address 2 Configure BIOS assisted RAID For more information refer to Managing BIOS assisted RAID on an SGI UV 300H Server SGI publication number 007 6454 00x Note It is not necessary to flash any firmware on the BaseIO card ...

Страница 5: ...nk and UV are trademarks or registered trademarks of Silicon Graphics International Corp in the United States and or other countries worldwide SAP SAP HANA and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE or an SAP affiliate company in Germany and other countries All other trademarks mentioned herein are the pr...

Отзывы: