
4
007-4377-002
1: Operation Procedures
Powering On the System
This section describes how to prepare to power on your system, and how to power on
your system by using either of the following:
•
L1 controller
•
System console
Preparing to Power On
To prepare to power on your system, follow these steps:
1.
Check to ensure that the cabling between the power distribution unit (PDU) and the
wall power-plug receptacle is secure.
2. For each individual brick that you want to power on, make sure that the
PWR
(power) switch is set to the
1
(on) position, as shown in Figure 1-1 for the IX-brick.
This will start the L1 controller(s) for the brick(s) when the brick(s) are powered on.
The 12-VDC LED on an individual brick illuminates green when an L1 controller
has powered on successfully.
Figure 1-1
Power Switch “On” Setting
48V
12V
Switch set to On
Содержание SGI Altix 3700 Bx2
Страница 1: ...SGI Altix 3700 Bx2 User s Guide Document Number 007 4377 002 ...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 70: ...46 007 4377 002 3 System Overview Figure 3 1 SGI Altix 3700 Bx2 Series Systems ...
Страница 85: ...Tall Rack 40U 007 4377 002 61 Figure 4 1 Tall 40U Rack ...
Страница 88: ......
Страница 90: ...66 007 4377 002 5 CR brick Figure 5 1 Front and Side View of CR brick ...
Страница 128: ......
Страница 136: ......
Страница 144: ......
Страница 184: ......