48
007-4498-002
2: Installation Procedures
Positioning and Leveling Single-rack System
Caution:
To avoid ESD damage to the electronic components, be sure to position the rack
before you remove the ESD bag that covers the rack assembly.
1. Grasp the rear of the rack and roll the rack to its designated location.
2. Remove the ESD bag.
3. If you are installing a tall rack, adjust the leveling bolts, as shown in Figure 2-7, until
the rack is level.
Figure 2-7
Leveling Bolts
4. Ensure that the circuit breaker on the power distribution unit is in the OFF (0)
position. Then connect the power cord to a grounded power outlet. Plugging in the
power cord grounds the rack.
5. Secure the rack with seismic tie-downs if you are installing the system in an
earthquake zone.
Note:
Tall and short racks have four threaded holes that are located at the bottom of the
rack (refer to Figure 2-8). Use these holes to secure the seismic tie-downs. SGI does not
supply the seismic tie-downs.
!
Содержание Origin 300
Страница 1: ...SGI Origin 300 System with NUMAlink Module User s Guide 007 4498 002 ...
Страница 4: ......
Страница 26: ......
Страница 35: ...Base System Components 007 4498 002 9 Figure 1 7 Front and Rear Views of an SGI Origin 300 Base Module ...
Страница 39: ...Base System Components 007 4498 002 13 Figure 1 10 L2 Controller ...
Страница 49: ...Optional System Components 007 4498 002 23 Figure 1 17 SGI TP9400 Storage System ...
Страница 54: ...28 007 4498 002 1 Introduction Figure 1 18 Tape Drive Libraries L20 L40 L80 L180 L700 ...
Страница 71: ...Installing Your System 007 4498 002 45 Figure 2 5 Removing a Short Rack from the Shipping Crate Peg ...
Страница 78: ......
Страница 93: ...Disk Drives 007 4498 002 67 Figure 3 11 Installing a Disk Drive c Bezel door Disk drive Bezel door a b d ...
Страница 118: ......
Страница 264: ......