INSTALLATION
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at
the center of the area in which the hood is to be fitted.
Mark Points:
Mark a point (1) on the horizontal line A, 80 mm to the
vertical reference line.
Repeat this operation on the other side and on the vertical
reference line, checking that the three marks are leveled.
Mark a point (2) on the horizontal line B, 60 mm to the
vertical reference line.
A horizontal line A at 970 – 1070 mm above the cooker top.
A horizontal line B at a X mm above the horizontal line A.
A horizontal line C at a 243 mm below the horizontal line A .
WALL DRILLING AND BRACKET FIXING
100 100
80
60
60
80
C
A
X
970-1
070
243
B
(3)
(2)
(1)
Vertical reference line
Chimney
Option
1
400x390
160-500
2
500x490 260-700
B
8
Содержание SHD60FLIGNE/2
Страница 1: ......
Страница 3: ......
Страница 11: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 20: ......
Страница 21: ......
Страница 23: ......
Страница 30: ......
Страница 31: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 39: ...P N 16173000A14455...
Страница 40: ......