background image

2

Rotunda Wall-Mount Faucet Installation Instructions

ROTUNDA WALL-MOUNT FAUCET INSTALLATION

INSTALLATION

1.  Prepare for installation by installing wood blocking 
between the two studs where the faucet will mount.

Important: 

Take into consideration the thickness of 

your finished wall materials, such as tile, when calculat-
ing measurements. 

2.  Mount the valve body in its prepared location. Attach 
the valve body to the wood blocking using pipe clamps. 
Use a level to ensure that the valve is mounted straight.

Important: 

Leave the protective plastic sleeves on the 

valve until your finished wall is completed.

3.  Attach your existing water lines to the valve body. 
Apply thread sealant or plumber’s tape to the thread-
ed connection to ensure a watertight seal.

4.  Once your finished wall has been completed, 
remove the protective plastic sleeves from the valve 
body.

Wood Blocking

Finished Wall

Apply thread 

sealant or 

plumber’s tape

Hot Water Line

Cold Water Line

Отзывы: