3
4. Rest vanity on mounting bracket. From the under-
side of the vanity mark through the 3 mounting holes
on the back of the vanity.
Note:
A skinny pointed tool, such as a screw or
screwdriver can be used to mark mounting points
through the vanity.
Important:
If the studs in your bathroom do not line
up to the mounting location for your vanity, wood
blocking can be installed between the studs using
standard 2 x 4’s. If the wood blocking needs to be
installed behind the �nished wall, we recommend
consulting a professional if you are unfamiliar with
this type of installation.
Mounting holes
N A D I YA
WALL-MOUNT VANITY
SKU: 950070, 950071, 950072, 950073, 950074, 950075, 950076, 950077, 950078
5. Drill pilot holes at marked location. Once pilot
holes are drilled, install vanity using lag bolts and
washers.