background image

3

4. Rest vanity on mounting bracket.  From the under-

side of the vanity mark through the 3 mounting holes 

on the back of the vanity.

Note: 

 A skinny pointed tool, such as a screw or 

screwdriver can be used to mark mounting points 

through the vanity. 

Important:

 

If the studs in your bathroom do not line 

up to the mounting location for your vanity, wood 

blocking can be installed between the studs using 

standard 2 x 4’s. If the wood blocking needs to be 

installed behind the �nished wall, we recommend 

consulting a professional if you are unfamiliar with 

this type of installation.

Mounting holes

N A D I YA

WALL-MOUNT VANITY

SKU: 950070, 950071, 950072, 950073, 950074, 950075, 950076, 950077, 950078

5. Drill pilot holes at marked location.  Once pilot 

holes are drilled, install vanity using lag bolts and 

washers.  

Отзывы: