Publication date:March., 2011
Revision A1
361
Power Requirement :
AC Line
SIGNAMAX 065-7851 L2
DC Line
SIGNAMAX 065-7851 L2 D
Ambient Temperature :
0
°
to 40
°
C
Humidity :
5% to 90%
Dimensions :
44(H)
×
442(W)
×
209(D) mm
Comply with FCC Part 15 Class A & CE Mark Approval
Management Software Specifications
System Configuration
Auto-negotiation support on 8-Port 10/100/1000
Base-TX ports, Web browser or console interface
can set transmission speed (10/100/1000Mbps)
and operation mode (Full/Half duplex) on each
port, enable/disable any port, set VLAN group, set
Trunk Connection.
Management Agent
SNMP support; MIB II, Bridge MIB, RMON MIB
Networking Convergence
Algorithm
IEEE 802.1D Spanning Tree
IEEE 802.1w Rapid Spanning Tree
IEEE 802.1s Multiple Spanning Tree
VLAN Function
Port-Base / 802.1Q-Tagged, allowed up to 4K
active VLANs in one switch.
Q-in-Q Double tag.
Port Isolation
Trunk Function
Ports trunk connections allowed
Bandwidth Control
Supports by-port Egress/Ingress rate control
Quality of Service (QoS)
Referred as Class of Service (CoS) by the
IEEE 802.1P standard ,Classification of packet
priority can be based on either a VLAN tag on
packet or a user-defined
Per port QoS.
4 queues per port
IP TOS Classification
TCP/UDP Port Classification
IP DiffServe Classification
Security
Limit number of MAC addresses learned per
port static MAC addresses stay in the filtering table.
IEEE802.1X Port Authentication
DHCP Snoopingg
IP-MAC Port Binding
ACLs
SSL/SSH
Multicast
P Multicast Filtering by passively snooping
on the IGMP Query.
IP Multicast : IGMP Snooping
Maximum of 1024 active entries of Group
IGMP Proxy
MVR (Multiple VLAN Registration)
Voltage
: 100
∼
240 VAC
Frequency
: 50
∼
60 Hz
Consumption
: 40W
Voltage
: 36~72 VDC
Consumption
: 40W
Содержание 065-7851
Страница 1: ......
Страница 2: ......
Страница 62: ...Publication date Oct 2012 Revision A2 60 Fig 3 12 ...
Страница 101: ...Publication date Oct 2012 Revision A2 99 Fig 3 34 ...
Страница 104: ...Publication date Oct 2012 Revision A2 102 Fig 3 37 Fig 3 38 Fig 3 39 ...
Страница 105: ...Publication date Oct 2012 Revision A2 103 Fig 3 40 Fig 3 41 ...
Страница 106: ...Publication date Oct 2012 Revision A2 104 Fig 3 42 ...
Страница 121: ...Publication date Oct 2012 Revision A2 119 Fig 3 61 Set up VLAN Tag Priority Mapping ...
Страница 122: ...Publication date March 2011 Revision A1 120 Fig 3 62 Set up VLAN Tag Priority Mapping Finish ...
Страница 136: ...Publication date Oct 2012 Revision A2 134 Fig 3 69 Frame Type Fig 3 70 ...
Страница 137: ...Publication date Oct 2012 Revision A2 135 Fig 3 71 Fig 3 72 Fig 3 73 ARP ...
Страница 138: ...Publication date Oct 2012 Revision A2 136 Fig 3 74 ARP Fig 3 75 ARP Fig 3 76 ARP Fig 3 77 ARP ...
Страница 139: ...Publication date Oct 2012 Revision A2 137 Fig 3 79 ARP Fig 3 80 ARP Fig 3 81 ARP ...
Страница 140: ...Publication date Oct 2012 Revision A2 138 Fig 3 82 ARP Fig 3 83 ARP Fig 3 84 ARP Fig 3 85 ARP Fig 3 86 ARP ...
Страница 141: ...Publication date Oct 2012 Revision A2 139 Fig 3 87 ARP Fig 3 88 IPv4 ...
Страница 142: ...Publication date Oct 2012 Revision A2 140 Fig 3 89 IPv4 Fig 3 90 IPv4 Fig 3 91 IPv4 Fig 3 92 IPv4 Fig 3 93 IPv4 ...
Страница 143: ...Publication date Oct 2012 Revision A2 141 Fig 3 94 IPv4 Fig 3 95 IPv4 Fig 3 96 IPv4 Fig 3 97 IPv4 Fig 3 98 IPv4 ...
Страница 144: ...Publication date Oct 2012 Revision A2 142 Fig 3 99 IPv4 Fig 3 100 IPv4 Fig 3 101 IPv4 Fig 3 102 IPv4 ...
Страница 145: ...Publication date Oct 2012 Revision A2 143 Fig 3 103 IPv4 Fig 3 104 IPv4 Fig 3 105 IPv4 ...
Страница 146: ...Publication date Oct 2012 Revision A2 144 Fig 3 106 IPv4 Fig 3 107 IPv4 Fig 3 108 IPv4 ...
Страница 147: ...Publication date Oct 2012 Revision A2 145 Fig 3 109 IPv4 Fig 3 110 IPv4 Fig 3 111 IPv4 ...
Страница 148: ...Publication date Oct 2012 Revision A2 146 Fig 3 112 IPv4 Fig 3 113 IPv4 Fig 3 114 IPv4 ...
Страница 149: ...Publication date Oct 2012 Revision A2 147 Fig 3 115 IPv4 Fig 3 116 IPv4 Fig 3 117 IPv4 ...
Страница 150: ...Publication date Oct 2012 Revision A2 148 Fig 3 118 Action Fig 3 119 Rate Limiter ...
Страница 151: ...Publication date Oct 2012 Revision A2 149 Fig 3 120 Port Copy Fig 3 121 DMAC Filter ...
Страница 152: ...Publication date Oct 2012 Revision A2 150 Fig 3 122 VLAN ID Filter Fig 3 123 VLAN ID Filter Fig 3 124 Tag Priority ...
Страница 165: ...Publication date Oct 2012 Revision A2 163 Fig 3 129 Set up Policy Rules Finish Fig 3 130 Set up Port Policies ...
Страница 166: ...Publication date Oct 2012 Revision A2 164 Fig 3 131 Set up Port Policies Fig 3 132 Set up Port Policies ...
Страница 190: ...Publication date Oct 2012 Revision A2 188 Fig 3 148 Parameter description Port Port Number 1 24 ...
Страница 193: ...Publication date Oct 2012 Revision A2 191 Ready Ports Show only the ready member ports within an aggregator port ...
Страница 250: ...Publication date Oct 2012 Revision A2 248 Fig 4 1 Fig 4 2 ...