3.
Hardware Installation
The TPS is delivered as a desktop unit. 19" rack mounting brackets are available as an option. The mounting
brackets can be installed easily with four screws on the left and the right side panel. The 19" rack mounting
brackets including the screws have to be ordered separately.
3.1. Connection of the current sensor to the TPS rack
The current transducer will be connected to the TPS rack with the
delivered D-SUB current transducer connection cable.
3.2. Connection of the current output to an instrument current input terminal
The transducer output current can be directly connected to the
current input terminals of a current or a power meter.
3.3 . Connection of the optional voltage output to an instrument voltage input terminal
Before you connect the current output to the voltage input terminal
of a voltage meter or the sensor input terminal of a power meter you
have to transfer the output current to a voltage signal. For this
purpose, passive plug-on burden resistors and active plug-on output
voltage amplifiers are available.