BUILD-IN TOUCH TERMINAL
ETT 412
12.03.2019
Page 15
6
Mounting Instructions
The build-in terminal is provided for mounting in a control cabinet wall. For mounting in the
control cabinet wall, 8 angle clamps with threaded pins are provided. The front is therewith
pressed against the outer control cabinet wall. The brackets are affixed using a flat head
screwdriver with 0.2 Nm and therewith guarantee the necessary IP protection level for the
front.
The modules must be mounted vertically with enough clearance to nearby components
and/or the control cabinet back wall. This is necessary for optimal cooling and air circulation,
so that proper function up to the maximum operating temperature is ensured.
CAUTION
The terminal must be grounded to protective earth via the M3 threaded bolts
and the blade terminal, as well as to the control cabinet over a broad surface
via the mount.
La borne doit être reliée à la terre par l'intermédiaire des boulons filetés M3
et de la borne à lame, ainsi qu'à l'armoire électrique sur une large surface via
le support.
6.1
Vertical Mounting Position