1. Overview
1.1 Purpose of this document
The purpose of this document is to provide qualified electrical
engineers and Siemens’ Certified installers with the steps
required to install a VersiCharge 175 kW Fast Charger site.
This document is for both the single and dual-cable variants
of the VersiCharge 175 kW Fast Charger.
Note: The images used in this document are of the dual
cable variant.
1.2 Disclaimer and warranty
This manual sets out Siemens’ understanding of best-practice
methodologies and its requirements for installation of the
VersiCharge 175 kW Fast Charger, and is provided to
customers pursuant to the same terms and conditions under
which Siemens has supplied its products.
Siemens encourages all owners of its products to consult a
qualified engineering firm to provide independent advice on
the methodologies set out in this manual and site design
requirements, including, in relation to applicable regulatory
and statutory requirements. All site designs must be reviewed
and approved by a professional engineer.
Siemens disclaims any and all liability for any loss caused,
whether due to negligence or otherwise, arising from the strict
adherence to the requirements set out in this manual in
contravention of applicable regulatory and legal requirements.
It is an express condition of Siemens’ manufacturer warranty
that:
• The requirements set out in this manual are adhered to
(subject to applicable regulatory and legal requirements)
when installing the VersiCharge 175 kW Fast Charger; and
• The installation is conducted by a Siemens Certified
technician who has completed Siemens’ installation
training course for the VersiCharge 175 kW Fast Charger.
1.3 Acronyms and abbreviations
Acronym /
abbreviation
Definition
IPU
Isolated Power Unit
UU
User Unit
DMM
Digital multimeter
CID number
Component Identification Number
LV
Low Voltage
LVR Kit
Low Voltage Rescue Kit
UV
Undervoltage
VersiCharge 175
kW Fast Charger
VersiCharge 175 kW Fast Charger
Comprised of a single IPU and a pair of UU
1.4 Identifying symbols
Symbol
Meaning
CRITICAL
CAUTION
RISK OF ELECTRIC SHOCK
Dangerous voltage
direct current
ø
Phase symbol
∿
Alternating Current Supply Symbol
3-Phase Alternating Supply, (No Neutral
connection)
Operators manual; operating installations
Read operators manual
Site Installation Manual
| VersiCharge Ultra 175™ kW Fast Charger
3