background image

Dry Contact

Three 3' 18 AWG wires are included through the nipple as the Dry Contacts. 

 

 

 

 

•  Please note: Dry Contacts are designed for low voltage or control signals only. 

 

 

 

• 

Maximum 

switching 

current 

is 

5A         

•  Maximum switching voltage is 240V DC or AC. 

 

 

 

 

 

 

 

•  Higher energy applications require additional relay implementation outside the SPD.   

 

 

•  Gray is Common, Blue is Normally Open and Red is Normally Closed. If the Dry Contacts are not utilized,  
  insulate lead ends, coil and secure.

Maintenance

SPDs require minimal maintenance. We recommend periodic inspection of diagnostic indicators to ensure 
proper operation. We also recommend keeping the SPD clean as appropriate.

Troubleshooting and Service

Please contact Siemens Technical Support for any service related issues. We want to take care of any 
problems.

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

 11

TPS4 13

Содержание TPS4 13

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Surge Protection Devices TPS4 13 usa siemens com spd ...

Страница 2: ... separately derived systems is not bonded to ground in accordance with the NEC Do Not Hi Pot Test SPDs Any factory or on site testing of power distribution equipment that exceeds normal operating voltage such as high potential insulation testing or any other tests where the suppression components will be subjected to higher voltage than their rated Maximum Continuous Operating Voltage MCOV must be...

Страница 3: ...Enclosure Standard Voltage Code A 120 240 V 1Ø 3W B 120 240 V 3Ø 4W C 120 208 V 3Ø 4W D 240 V 3Ø 3W E 277 480 V 3Ø 4W F 480 V 3Ø 3W G 600 V 3Ø 3W K 380 220 V 3Ø 4W L 600 347 V 3Ø 4W S 400 230 V 3Ø 4W X Surge Counter Standard Catalog No TPS4 13 Options 2 Type 2 SPD Default Includes UL 1283 EMI RFI Filters 0 Type 1 SD Consult Factory Prior to Ordering T 415 240 V 3Ø 4W W 220 127 V 3Ø 4W TPS4 13 Cata...

Страница 4: ...Before installing SPD verify that it has the same voltage rating as the power distribution system Compare the SPDs nameplate voltage or model number and ensure that SPD configuration matches the intended power source Circuit Breaker Connected When connected on load side of main disconnect we suggest connecting via a 60A circuit breaker The circuit breaker is the intended disconnect switch and prov...

Страница 5: ...other acceptable building earth ground such as the building frame in the case of a high rise steel frame structure d Pressure terminal or pressure splicing connectors and soldering lugs used in the installation of the filter shall be identified as being suitable for the material of the conductors Conductors of dissimilar metals shall not be intermixed in a terminal or splicing connector where phys...

Страница 6: ...tion 3 Remove power for panel Confirm panel is deenergized 4 Identify connection breaker location and SPD location 5 Make sure leads are short 6 Remove an appropriately sized knockout from panel 7 Mount SPD Connect to equipment using an approved wiring method including seals appropriate for the enclosure rating 8 Connect conductors as appropriate short and straight as possible Note that Hi Legs ar...

Страница 7: ...nt the screen saver will be dismissed and will not be displayed again until the event is acknowledged by an operator Main Screen The Main Screen is the starting point for navigating through the SPDs menus The Main Screen will show the logged data for the most recent event as well as the current time and date Pressing the UP or DOWN buttons will move to the Main Menu Screen Main Menu Screen The Mai...

Страница 8: ...the SPD s statistics and event history You are also able to clear the history if need be Use the UP DOWN buttons to select which operation to do Pressing the CENTER button will advance you to the screen you have selected Statistics Screen The Statistics Screen shows the number of events that the SPD has experienced The total number of each event type will be shown here The date of the last recorde...

Страница 9: ...u Screen System Event Alarms Surge Event Screen When the SPD detects a surge event this animation will be shown It will remain on screen until acknowledged by an operator Any subsequent events that occur while the Surge event animation is on screen will be registered and queued for acknowledgment Along with displaying the Surge animation the Audio alarm will sound Pressing the CENTER button will a...

Страница 10: ...mation is on screen will be registered and queued for acknowledgment Along with displaying the NGF animation the Audio alarm will sound Pressing the CENTER button will acknowledge the event and clear the alarm state The Main Screen will be showing the details for the NGF The SPD may be exposed to a NGF for several minutes The NGF animation will be displayed as soon as a NGF has been detected If an...

Страница 11: ...SPD Gray is Common Blue is Normally Open and Red is Normally Closed If the Dry Contacts are not utilized insulate lead ends coil and secure Maintenance SPDs require minimal maintenance We recommend periodic inspection of diagnostic indicators to ensure proper operation We also recommend keeping the SPD clean as appropriate Troubleshooting and Service Please contact Siemens Technical Support for an...

Страница 12: ... make representations warranties or assurances as to the accuracy or completeness of the content contained herein This document contains a general description of available technical options only and its effectiveness will be subject to specific variables including field conditions and project parameters Siemens reserves the right to modify the technology and product specifications in its sole disc...

Отзывы: