background image

Document No. 565-939
Installation Instructions
Rev. 1, November, 1999

Page 2 of 4

Siemens Building Technologies, Inc.

a.  Notify the appropriate building personnel

that you will be turning OFF power to the
enclosure, and tell them what equipment
will be affected.

b.  Follow all shutdown procedures necessary

to prevent damage to any equipment or
harm to any personnel.

N

N

N

NO

O

O

OTTTTEEEE::::

 

If the MBC or RBC enclosure already
houses one or more Controller
Modules and/or Open Processors,
make sure their batteries are good. If
any battery status LED is red when
the power is ON, replace the battery
before proceeding.

2.  Turn OFF power to the MBC or RBC enclosure.

3.  If you are installing the Open Processor in an

empty MBC or RBC enclosure, remove the
temporary cover (Figure 2) that is wrapped
around the mounting rails, M-BUS rails, and the
C-BUS. Save one connector for FLN 1 and one
for the BLN if it is used.

Figure 2.  Temporary Cover.

4.  Remove the C-BUS cover from the lowest

available slot and discard it.

5.  Remove any M-BUS protective tape from the

M-BUS.

6.  Remove the warning label from the Open

Processor to expose the C-BUS card (Figure 3).

Figure 3.  Open Processor: Rear View.

Installing the Open Processor

N

N

N

NO

O

O

OTTTTEEEE::::

 

The goal of this procedure is to place the
Open Processor’s C-BUS and M-BUS
connectors into their respective slots and
secure the module.

CA

CA

CA

CAU

U

U

UTTTTIIIIO

O

O

ON

N

N

N::::

 

Improperly aligning and/or installing
the Open Processor may damage it.

1. 

On the right-hand side of the Open Processor,
locate the lower mounting guide (Figure 4).

2. 

Locate the round mounting rail on the far right
edge of the right-hand M-BUS rail (Figure 4).

3. 

Align the module’s lower mounting guide with
the lowest available slot next to the round
mounting rail (Figure 4).

4. 

Insert the lower and upper mounting guides into
the mounting slot and hook them into place
(Figure 4).

5. 

Push the left side of the Open Processor
forward so that its C-BUS card edge and
M-BUS connector mate with the C-BUS
connector and M-BUS rails (Figure 5). When
the Open Processor is seated properly, you will
hear a “click.”

6. 

If the Open Processor needs to be repositioned:

a.  Locate the module’s latch (on the module’s

far left end). Release the latch by pulling it
toward you.

b.  Swing the left end of the Open Processor

toward you to remove the module from its
C-BUS slot (Figure 5).

c.  Pull on the Open Processor to remove its

mounting guides from the round mounting
rail (Figure 4).

d.  Repeat Steps 2 through 5 above.

1.  Turn ON power to the MBC or RBC enclosure.

2.  If you changed the operating state of any

equipment, restore it to its previous state.

N

N

N

NO

O

O

OTTTTEEEE::::

 

If you use the BLN that is mentioned in the

Prerequisites

 section, do NOT plug the

connector attached to it into the Open
Processor’s BLN port. This will be done
during start-up.

The Open Processor installation is now complete.

Содержание System 600 APOGEE

Страница 1: ...lade screwdriver 1 8 blade width Wire strippers One 115V or 230V depending on device receptacle to power the Trunk Interface II Cabling and connectors Figure 6 CA CA CA CAU U U UT T T TI I I IO O O ON N N N Always wear an electro static discharge wrist strip and discharge accumulated static before touching field panel components PREREQUISITES MBC or RBC enclosure mounted with at least one open slo...

Страница 2: ...e slots and secure the module CA CA CA CAU U U UT T T TI I I IO O O ON N N N Improperly aligning and or installing the Open Processor may damage it 1 On the right hand side of the Open Processor locate the lower mounting guide Figure 4 2 Locate the round mounting rail on the far right edge of the right hand M BUS rail Figure 4 3 Align the module s lower mounting guide with the lowest available slo...

Страница 3: ...ment No 565 939 Installation Instructions Rev 1 November 1999 Siemens Building Technologies Inc Page 3 of 4 Figure 4 Attaching the Open Processor to the Mounting Guides Figure 5 Latching the Open Processor ...

Страница 4: ...wing guidelines for P2 Trunk use in installation instructions P N 538 663 install the Trunk Interface II 3 Make cable per diagram in Figure 6 4 Connect the Open Processor to the Trane Tracer Summit BCU using the guidelines in Figure 6 5 Plug in power supply for Trunk Interface II 6 Turn ON power to the MBC or RBC enclosure FLN 1 POWER BLN OPEN PROCESSOR S S RS 485 TRUNK CABLE MAX 4000 1219 2 m STA...

Отзывы: