PRODUCT DESCRIPTION

Each Open Processor (Figure 1) contains the main
processor, memory, and communications circuitry
for connecting the System 600 APOGEE to the
Trane Tracer Summit BCU.

Figure 1.  Open Processor: Front View.

The Open Processor attaches to the left mounting
rail, the M-BUS rails, and the C-BUS slot of the MBC
or RBC enclosure.

N

N

N

NO

O

O

OTTTTEEEE::::

 

An MBC or RBC enclosure is FCC-
approved for a maximum of four Controller
Modules and/or Pre-APOGEE Open
Processors, or a maximum of five
APOGEE Open Processors.

PRODUCT NUMBERS

565-363

Open Processor with Trane Driver 
(APOGEE)

565-302

Open Processor with Trane Driver 
(Pre-APOGEE)

538-670 

Trunk Interface II, 115V

538-675

Trunk Interface II, 230V

545-710

Battery Replacement Kit. Refer to 
Installation Instructions 545-408.

545-712

MMI Extension Cable. Refer to 
Installation Instructions 545-407.

538-583

Grounding Wire.

EXPECTED INSTALLATION TIMES

7 minutes.

REQUIRED TOOLS AND MATERIALS

 

Flat-blade screwdriver (1/8" blade width)

 Wire 

strippers

 

One 115V or 230V (depending on device)
receptacle to power the Trunk Interface II

 

Cabling and connectors (Figure 6)

CA

CA

CA

CAU

U

U

UTTTTIIIIO

O

O

ON

N

N

N::::

 

Always wear an electro-static
discharge wrist strip and discharge
accumulated static before touching
field panel components.

PREREQUISITES

 

MBC or RBC enclosure mounted with at
least one open slot on the C-BUS and AC
power connected.

 

Backups made of the current database for
all Open Processors and other Controller
Modules in the enclosure.

 

Both systems installed and checked out by
certified representatives of the companies
that installed each system. These checkouts
must confirm that each system is operating
and ready to communicate with the other
system.

 

Building level network (BLN) cable, if used,
fed into the MBC or RBC enclosure. If
necessary, splice in a connector for the
Open Processor. (Connecting this cable is
done later during start-up.)

INSTRUCTIONS

Preparing to Install the Open Processor

1. 

Prepare the MBC or RBC enclosure for
shutdown by performing the following steps:

CA

CA

CA

CAU

U

U

UTTTTIIIIO

O

O

ON

N

N

N::::

 

Do not install or remove an Open
Processor while the MBC or RBC
enclosure is powered up. Doing so may
damage the Open Processor or other
modules in the enclosure.

Содержание System 600 APOGEE

Страница 1: ...lade screwdriver 1 8 blade width Wire strippers One 115V or 230V depending on device receptacle to power the Trunk Interface II Cabling and connectors Figure 6 CA CA CA CAU U U UT T T TI I I IO O O ON N N N Always wear an electro static discharge wrist strip and discharge accumulated static before touching field panel components PREREQUISITES MBC or RBC enclosure mounted with at least one open slo...

Страница 2: ...e slots and secure the module CA CA CA CAU U U UT T T TI I I IO O O ON N N N Improperly aligning and or installing the Open Processor may damage it 1 On the right hand side of the Open Processor locate the lower mounting guide Figure 4 2 Locate the round mounting rail on the far right edge of the right hand M BUS rail Figure 4 3 Align the module s lower mounting guide with the lowest available slo...

Страница 3: ...ment No 565 939 Installation Instructions Rev 1 November 1999 Siemens Building Technologies Inc Page 3 of 4 Figure 4 Attaching the Open Processor to the Mounting Guides Figure 5 Latching the Open Processor ...

Страница 4: ...wing guidelines for P2 Trunk use in installation instructions P N 538 663 install the Trunk Interface II 3 Make cable per diagram in Figure 6 4 Connect the Open Processor to the Trane Tracer Summit BCU using the guidelines in Figure 6 5 Plug in power supply for Trunk Interface II 6 Turn ON power to the MBC or RBC enclosure FLN 1 POWER BLN OPEN PROCESSOR S S RS 485 TRUNK CABLE MAX 4000 1219 2 m STA...

Отзывы: