108
SIVACON S8 Planning Principles –
Glossary and rated parameters
11.4 Index of figures
Fig.
Title
Page
Chapter 1
1.1
Totally Integrated Power (TIP) as holistic
approach to electric power distribution
1.2
SIVACON S8 for all areas of application
1.3
Use of SIVACON S8 in power distribution
Chapter 2
2/1
2/2
2/3
Integration of the corner cubicle
2/4
Variable busbar position for SIVACON S8
Chapter 3
3/1
Cubicles in circuit-breaker design
3/2
Forced cooling in a circuit-breaker cubicle
3/3
Cubicle types for direct supply and direct feeder
(refer to the text for explanations)
Chapter 4
4/1
4/2
Cubicle with forced cooling for universal
mounting design
4/3
Combination options for universal mounting
design
4/4
4/5
4/6
Positions in the SFD contact system
4/7
Normal withdrawable unit in SFD with a
withdrawable unit height of 100 mm
4/8
Open withdrawable unit compartments in SFD
4/9
Structure of a small withdrawable unit in HFD
4/10
Positions in the HFD contact system
4/11
4/12
4/13
Front areas usable for an instrument panel on
normal withdrawable units
4/14
Compartment for normal withdrawable unit in
HFD
4/15
Adapter plate for small withdrawable units
Chapter 5
5/1
5/2
Pluggable in-line switch-disconnectors 3NJ62
5/3
Pluggable in-line switch-disconnectors SASIL plus
Fig.
Title
Page
Chapter 6
6/1
Cubicles for fixed-mounted in-line design with
3NJ4 in-line switch-disconnectors
6/2
Cubicles for fixed mounting with front cover
6/3
Installation of switching devices in fixed-
mounted cubicles with a front cover (cover
opened)
6/4
Cable connections in fixed-mounted cubicles
with a front cover
6/5
Mounting kit for modular installation devices
(without cover)
6/6
Cubicles for customized solutions
Chapter 7
7/1
Cubicle for reactive power compensation
7/2
Capacitor modules for reactive power
compensation
Chapter 8
8/1
8/2
Maintenance gangway widths and passage
heights
8/3
Minimum widths of maintenance gangways in
accordance with IEC 60364-7-729
8/4
Cubicle arrangement for single-front (top) and
double-front systems (bottom)
8/5
Permissible deviations of the installation area
8/6
8/7
Foundation frame mounted on concrete
8/8
Mounting points of the single-front system
8/9
Mounting points of the single-front system
8/10
Mounting points for the corner cubicle
Chapter 9
9/1
Insulated main busbar in the SIVACON S8
(optional N insulation)
9/2
9/3
Comparison of seismic scales for the
classification of seismic response categories of
SIVACON S8
9/4
EC-Declaration of Conformity for SIVACON S8 in
respect of the Low Voltage and EMC Directives
9/5
Declaration of Conformity for SIVACON S8
regarding design verification
9/6
Declaration of Conformity for SIVACON S8
regarding design verification - Annex Page 1/2
9/7
Declaration of Conformity for SIVACON S8
regarding design verification - Annex Page 2/2
Chapter 10
10/1
Systems according to the type of connection to
earth in accordance with IEC 60364-1
10/2
10/3
Содержание Sivacon S8
Страница 1: ...Totally Integrated Power www siemens com sivacon s8 SIVACON S8 Technical Planning Information 10 2015 ...
Страница 2: ......
Страница 6: ...Chapter 1 System based power distribution ...
Страница 23: ...20 SIVACON S8 Planning Principles SIVACON S8 System overview ...
Страница 35: ...32 SIVACON S8 Planning Principles Circuit breaker design ...
Страница 93: ...90 SIVACON S8 Planning Principles Conforming to standards and design verified ...