Start Up
8.7 Load cell replacement
SITRANS WW310
30
Operating Instructions, 03/2014, A5E33490433-AA
8.7.2
Installing new load cell
Step 1
Slide the new load cell into position.
Step 2
Install the two bottom load cell mount bolts and tighten them by hand.
The load cell should now be resting against the overload stop.
Step 3
Install the two top/front load cell mount bolts. Tighten them by hand.
Step 4
Start with the bottom load cell mounting bolts, and tighten them to the torque rating specified
with the new load cell. Now tighten the two top/front load cell mounting bolts to the same torque
value.
Step 5
Route the load cell cable to the junction box, and connect the load cell according to the supplied
interwiring diagram.
Repeat for other load cells if necessary
Step 6
Perform a load cell balancing procedure as described in the integrator instruction manual.
Содержание SITRANS WW310
Страница 1: ...SITRANS Weighfeeders SITRANS WW310 Operating Instructions 03 2014 ...
Страница 8: ...Introduction 1 1 The Manual SITRANS WW310 6 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 10: ...Safety notes 2 1 Safety and General Precautions SITRANS WW310 8 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 12: ...Technical data 3 1 Specifications SITRANS WW310 10 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 14: ...Operation 4 1 Weighfeeders SITRANS WW310 12 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 19: ...Mechanical installation 5 1 Installation SITRANS WW310 Operating Instructions 03 2014 A5E33490433 AA 17 ...
Страница 20: ......
Страница 22: ...Calibration 6 3 Span SITRANS WW310 20 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 24: ...Wiring SITRANS WW310 22 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 36: ...Troubleshooting 9 1 Mechanical troubleshooting SITRANS WW310 34 Operating Instructions 03 2014 A5E33490433 AA ...
Страница 47: ......