background image

7ML19985CF02

SITRANS LU SAM – INSTRUCTION MANUAL

Page 7

Operation

Relay setpoints and function are established when programming the associated 
application device. Refer to the associated instruction manual. 

When power to the SITRANS LU SAM is applied, the Power / Data LED (center) 
illuminates to indicate the power on condition. All relays default to the energized state, 
relay LEDs off, until updated by the application device. 

The Power / Data LED flashes whenever a valid message is received from the application 
device. If the LED does not flash, check for faulty communication wiring. 

The buffers associated with the individual relay points hold the received data until it is 
updated, controlling the relay and the relay LED status accordingly. When an alarm ON 
status is received, the programmed relay de-energizes and the corresponding LED lights. 
As the buffers are updated subject to the scan sequence as programmed into the 
application device, relay and LED status are independent of the application device LCD 
display. 

On interruption of power, all relays de-energize (LEDs off), but the stored status is 
memorized for ten minutes. Once power is restored, all relays revert to their previous 
status, if the memory is intact, and normal operation resumes. 

If SW1 - 7 is closed, relay 20 is redefined as a Loss of Communication (LOC) alarm. If 
communication is broken for 5 minutes or more, the relay de-energizes and its associated 
LED lights. When communication is re-established, or by opening SW1 - 7, the relay and 
LED resume their normal operating status. 

The SITRANS LU SAM may be tested in two ways: 
1.

Via the associated application device. Refer to the associated instruction manual. 

2.

Via the TEST switch SW1 - 6, located at the upper right corner of board A. 

Test overrides the normal operation of all 20 relays. The status LEDs sequentially flash on 
and off until switch 6 is reset (0) for normal operation of the SITRANS LU SAM. During 
test, the SITRANS LU SAM buffer is updated if communication has continued. Upon 
resumption of normal operation, the relays and LEDs assume the status found in the 
buffer. 

8

5

MIN

5

MIN

7

8

7

8

7

8

7

5

MIN

5

MIN

Loss of Communication

Normal

lever style

slider style

slider style

lever style

or

or

TEST

TEST

5

6

7

5

6

7

5

6

7

5

6

7

TEST

TEST

Test

Normal

lever style

slider style

slider style

lever style

or

or

Содержание SITRANS LU SAM

Страница 1: ...SITRANS LU SAM Instruction Manual May 2002 SITRANS LU SAM ...

Страница 2: ...n electronic version We encourage users to purchase authorized bound manuals or to view electronic versions as designed and authored by Siemens Milltronics Process Instruments Inc Siemens Milltronics Process Instruments Inc will not be responsible for the contents of partial or whole reproductions of either bound or electronic versions While we have verified the contents of this manual for agreeme...

Страница 3: ...e of Contents SITRANS LU SAM 1 Specifications 1 Installation 2 Outline and Mounting 2 Layout 3 Switch Setting 4 Interconnection 4 SITRANS LU 10 Communication 5 Relay Output 6 Power 6 Operation 7 Maintenance 8 ...

Страница 4: ...ii ...

Страница 5: ...ommunication from application device 20 mA bipolar current loop 4800 baud rate non polarized Output relays 20 multi purpose relays programmable from associated application device 1 form C SPDT contact per relay rated 5 A at 250 V ac non inductive communication 20 mA bipolar current loop input retransmission maximum loading 1 receiving unit Displays 1 power communication status LED 20 relay status ...

Страница 6: ...g Notes Installation shall only be performed by qualified personnel and in accordance with local govering regulations Do not mount the SITRANS LU SAM in direct sunlight without the use of a sun shield This product is susceptible to electrostatic shock Follow proper grounding procedures Note Non metallic enclosure does not provide grounding between connections Use grounded type bushings and jumpers...

Страница 7: ...30 31 32 33 14 15 16 17 18 19 20 21 22 23 25 26 27 2 3 4 5 6 7 8 9 10 11 12 13 28 29 30 31 32 33 14 15 16 17 18 19 20 21 22 23 24 25 26 27 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 1 SHLD RECEIVER TRANSMITTER 11 12 13 14 15 16 17 18 19 20 34 35 34 35 36 37 36 37 SPARE SPARE BIPOLAR PN 24751432 01 L1 L2 N TB3 TB2 RC1 J1 IC1 IC5 CR1 C7 C6 R27 RP1 R22 IC2 IC3 C2 C3 C1 C10 1 2 3 4 5 6 7 8 9 1...

Страница 8: ... board A in order to enable the SITRANS LU SAM corresponding to the points being addressed Interconnection System Diagram Typical system design Refer to associated application device instruction manual 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 ON ON ON ON BANK BANK BANK BANK bank 1 LU SAM 1 bank 2 LU SAM 2 lever style slider style SITRANS LU SAM SITRANS LU 10 ...

Страница 9: ... interconnecting cable shield should be grounded at applications device only Insulate shields at junctions to prevent inadvertent grounding 4 If SITRANS LU SAM is unpowered transmitter ceases communication to all downstream peripherals 5 Maximum individual loop length 3000 m 10 000 ft with specified cable 1 1 TB1 TB1 board B TB1 6 7 8 3 3 SPARE TRANSMIT RECEIVE RECEIVE SITRANS LU SAM 2 SITRANS LU ...

Страница 10: ...20 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 35 36 37 4 n o com n c 7 5 relay contact S P D T 5A at 250 Vac non inductive typical of up to 20 per LU SAM All relays are certified for use in equipment where the short circuit capacity of the circuits in which they are connected is limited by fuses...

Страница 11: ...ze LEDs off but the stored status is memorized for ten minutes Once power is restored all relays revert to their previous status if the memory is intact and normal operation resumes If SW1 7 is closed relay 20 is redefined as a Loss of Communication LOC alarm If communication is broken for 5 minutes or more the relay de energizes and its associated LED lights When communication is re established o...

Страница 12: ...ram of periodic checks is recommended This should include regular inspection general cleaning and good housekeeping practices The enclosure and circuit boards should be cleaned only when power is disconnected at the main breaker using a vacuum and clean dry paint brush Check all electrical terminals for corrosion and arcing ...

Страница 13: ...Notes Notes fm Page 1 Thursday October 11 2001 8 48 AM ...

Страница 14: ...Notes Notes fm Page 2 Thursday October 11 2001 8 48 AM ...

Страница 15: ...IQ300IX fm Page 5 Tuesday October 2 2001 1 43 PM ...

Страница 16: ... 7ml19985CF02 Rev 2 0 ...

Отзывы: