Concluding the Configuration
89
7SS52 V4 Manual
C53000-G1176-C182-3
4.8
Concluding the Configuration
Conclude the configuration by using a report to verify the allocation of the parameters
and transmit the parameters to the central unit or to the bay units.
To view a report when exiting the Plant Configuration you must:
Click
Options
→
Customize...
on the menu bar of the DIGSI Plant Configuration.
The window Customize opens.
Figure 4-36 Customize window
−
Example
Mark the checkbox
Show evaluation protocol when exiting
.
Subsequently click
OK
. The evaluation protocol (report) (Figure 4-37, page 89)
opens when you exit the Plant Configuration.
Figure 4-37 Evaluation protocol (report) when exiting the configuration
−
Example
www
. ElectricalPartManuals
. com
Содержание SIPROTEC 7SS522 V4.6
Страница 326: ...Maintenance and Repair 310 7SS52 V4 Manual C53000 G1176 C182 3 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 432: ...Appendix 416 7SS52 V4 Manual C53000 G1176 C182 3 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 438: ...Index 422 7SS52 V4 Manual C53000 G1176 C182 34 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...