Mounting and Commissioning
3
This chapter is intended for experienced commissioning staff. He must be familiar with the commissioning of
protection and control systems, the management of power systems and the safety rules and regulations. Hard-
ware adjustments to the power system data might be necessary. The primary tests require the protected object
(line, transformer, etc.) to carry load.
Mounting and Connections
Checking Connections
Commissioning
Final Preparation of the Device
Содержание SIPROTEC 7SJ61
Страница 368: ...Technical Data 4 22 Dimensions SIPROTEC 7SJ61 Manual C53000 G1140 C210 1 Release date 02 2008 368 ...
Страница 436: ...Appendix A 11 Measured Values SIPROTEC 7SJ61 Manual C53000 G1140 C210 1 Release date 02 2008 436 ...
Страница 438: ...Literature SIPROTEC 7SJ61 Manual C53000 G1140 C210 1 Release date 02 2008 438 ...
Страница 450: ...Glossary SIPROTEC 7SJ61 Manual C53000 G1140 C210 1 Release date 02 2008 450 ...
Страница 454: ...Index SIPROTEC 7SJ61 Manual C53000 G1140 C210 1 Release date 02 2008 454 ...