The phase currents and the phase-to-ground voltages are available as measuring quantities. A flowing current
excludes that the circuit breaker is open (exception: a short-circuit between current transformer and circuit
breaker). If the circuit breaker is closed, it may, however, still occur that no current is flowing. The voltages
can only be used as a criterion for the de-energized line if the voltage transformers are installed on the feeder
side. Therefore, the device only evaluates those measuring quantities that provide information on the status
of the line according to address 1134.
But a change-of-state, such as a voltage jump from zero to a considerable value (address 1131
PoleOpen-
Voltage
) or the occurrence of a considerable current (address 1130
PoleOpenCurrent
), can be a reliable
indicator for line energization as such changes can neither occur during normal operation nor in case of a
fault. These settings can only be changed via DIGSI at Display Additional Settings.
The position of the auxiliary contacts of the circuit breakers indicates directly the position of the circuit
breaker.
The detected energization is signaled through the indication
Line closure
(no. 590). Parameter 1132
SI
Time all Cl.
can be used to set the signal to a defined length. These settings can only be changed via
DIGSI at Display Additional Settings.
shows the logic diagram.
In order to avoid that an energization is detected mistakenly, the state „line open“, which precedes any energi-
zation, must apply for a minimum time (settable with the address 1133
T DELAY SOTF
). The default setting
for this enable delay is 250 ms. This setting can only be changed using DIGSI at Display Additional Settings.
[lo-zuschalterk-011010, 1, en_US]
Figure 2-61
Generation of the energization signal
The line energization detection enables the time overcurrent protection to trip instantaneously after energiza-
tion of the own line was detected.
Circuit-Breaker Position Detection
For Protection Purposes
Different protection and supplementary functions need information about the circuit-breaker status in order to
operate optimally. This is helpful for
•
the circuit-breaker failure protection (see Section
2.6 Circuit Breaker Failure Protection 50BF
),
•
the verification of the dropout condition for the trip command (see Section
at margin heading “Terminating the Trip Signal”).
2.12.2
Functions
2.12 Circuit Breaker Test
144
SIPROTEC 4, 7SD80, Manual
E50417-G1100-C474-A2, Edition 02.2018
Содержание SIPROTEC 4 7SD80
Страница 8: ...8 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 10: ...10 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 18: ...18 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 248: ...248 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 298: ...298 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 312: ...312 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 322: ...322 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 400: ...400 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...
Страница 402: ...402 SIPROTEC 4 7SD80 Manual E50417 G1100 C474 A2 Edition 02 2018 ...