NC Commissioning with HMI Advanced
11.4 Memory configuration
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
383
Number
Name
Name/remarks
28060
MM_IPO_BUFFER_SIZE
Number of NC blocks in the IPO buffer
28070
MM_NUM_BLOCKS_IN_PREP
Number of blocks for block preparation
28090
MM_NUM_CC_BLOCK_ELEMENTS
Number of block elements for Compile cycles
28100
MM_NUM_CC_BLOCK_USER_MEM
Size of block memory for Compile cycles
28105
MM_NUM_CC_HEAP_MEM
Heap memory for compile cycle applications
28210
MM_NUM_PROTECT_AREA_ACTIVE
Number of simultaneously active protection zones
28500
MM_PREP_TASK_STACK_SIZE
Stack size of preparation task
28510
MM_IPO_TASK_STACK_SIZE
Stack size of IPO task
28550
MM_PRSATZ_MEM_SIZE
Available memory for internal blocks
Axisspecific ($MA_ ... )
38010
MM_QEC_MAX_POINTS
Number of values for quadrant error compensation
11.4.2
SRAM memory
Free memory
The free SRAM memory is displayed via the following machine data:
●
MD18060 $MN_INFO_FREE_MEM_STATIC (free static memory)
The free SRAM should not be less than 15,000 bytes to ensure that data (e.g. tool offsets)
can be read in at all times.
Reconfiguation of the SRAM memory
Modifying the machine data listed in the following table results in a reconfiguration of the
SRAM with a loss of all user data. Before the change becomes effective in the NC, the
following alarm message is generated:
●
Alarm "4400 MD change results in reorganization of the buffered memory (loss of data!)"
NOTICE
When reconfiguring the SRAM memory, all user data are lost. To avoid data losses, a
series startup file should be created before reconfiguration (see Section "Creating a
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...