Configuration
3.1 System overview
Manual
110
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
3.1.2
PROFIBUS DP components
2QO\WKH3/&KDVDFFHVVWRWKH352),%86'3
LQWHUIDFH;7KHUHIRUHQRGULYHVDQGQR,2VRIWKH1&
FDQEHRSHUDWHGYLDWKLV352),%86OLQH
'LDJQRVH5HSHDWHUIRU
352),%86'3
3*3&]%
6,0$7,&32:(53*
PDFKLQHFRQWUROSDQHO
0&3
PDFKLQHFRQWUROSDQHO
0&3
6,1$0,&66
6,02'5,9(XQLYHUVDO
RSWLRQPRGXOH0RWLRQ&RQWURO
ZLWK352),%86'3
$OWHUQDWLYH
6,180(5,.'LVO
3&8
;
;
0&,%RDUG
352),%86'3
352),%86'3
'HFHQWU,2V\VWHP
6,0$7,&(7
$'
3XVKEXWWRQ3DQHO
033+
,20RGXO33
0,1,++8
Figure 3-2
System overview of SINUMERIK 840Di sl: PROFIBUS DP (schematic)
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...