5.6
Handling the BOP-2 operator panel
&RQWUROPRWRU
5HVHW
EDFNXS
%DVLF
FRPPLVVLR
QLQJ
6HOHFW
GLVSOD\
YDOXHV
'LDJQRVWLFV
DFNQRZOHGJH
IDXOW
&KDQJH
VHWWLQJV
6HWSRLQW
,QFUHDVH
GHFUHDVH
VSHHG
2XWSXWYROWDJH
9ROWDJH
9ROWDJH
'&OLQNYROWDJH
2XWSXWFXUUHQW
2XWSXW
IUHTXHQF\
6SHHG
6SHHG
&XUUHQW
&XUUHQW
6SHHG
237,216
6(783
3$5$06
',$*126
&21752/
021,725
)520&5'
72%23
5$0520
)520%23
72&$5'
'595(6(7
5(6(7
),1,6+
),/7(5
(;3(57
),/7(5
67$1'$5'
67$786
+,6725<
)$8/76
$&.1$//
5(9(56(
-2*
6(732,17
>$@
>9@
>PLQ@
63
>9@
92/7287
;;;;
U31111
>9@
'&/1.9
>$@
&855287
>+]@
)5(4
>$@
>PLQ@
>PLQ@
>9@
>PLQ@
>PLQ@
63>PLQ@
5$03':1
0DF3$U
'59$33/
1)
Status display once the power supply for the converter has been switched on.
Figure 5-13
Menu of the BOP-2
3URFHGXUHIRUVZLWFKLQJWKHPRWRURQDQGRIIYLDWKH
RSHUDWRUSDQHO
6ZLWFKRQPRWRU
6ZLWFKRIIWKHPRWRU
3UHVV0$18$/$872
0DVWHUFRQWURORIWKHLQYHUWHULVUHOHDVHG
YLDWKH%23
$QDODUPLVDFWLYH
)ODVKLQJV\PERO
$IDXOWLVDFWLYH
7KHPRWRULVVZLWFKHGRQ
-RJLVDFWLYH
-2*
Figure 5-14
Other keys and symbols of the BOP-2
Commissioning
5.6 Handling the BOP-2 operator panel
SINAMICS G120X converter
174
Operating Instructions, 06/2019, FW V1.01, A5E44751209B AC
Содержание SINAMICS G120X
Страница 2: ......
Страница 152: ...Wiring 4 2 Control interfaces SINAMICS G120X converter 150 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 940: ...Parameters 7 3 ASCII table SINAMICS G120X converter 938 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1114: ...Appendix A 1 Manuals and technical support SINAMICS G120X converter 1112 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1147: ......