5.4.2
Start quick commissioning and select the application class
Starting quick commissioning
Requirements
● The power supply is switched on.
● The operator panel displays setpoints and actual values.
Procedure
Proceed as follows to carry out quick commissioning:
Press the ESC key.
Press one of the arrow keys until the BOP-2 displays the "SETUP" menu.
To start quick commissioning, in the "SETUP" menu, press the OK key.
If you wish to restore all of the parameters to the factory setting before the quick commissioning,
proceed as follows:
1. Press the OK key.
2. Switchover the display using an arrow key: nO → YES
3. Press the OK key.
When selecting an application class, the inverter assigns the motor control with the appropriate
default settings:
●
Standard Drive Control (Page 124)
●
Dynamic Drive Control (Page 126)
●
63
6(783
5(6(7
3
'59$33/
Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
SINAMICS G120C converter
122
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34263257B AF