![Siemens SINAMICS CONNECT 500 Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/siemens/sinamics-connect-500/sinamics-connect-500_operating-instructions-manual_1265417027.webp)
Connection
6
6.1
Connect the LAN cable to the IPC (premounted version of the
connectivity module)
For operation, connect the connectivity module with your company network and the Internet via
the LAN interface of your IPC.
Note
When carrying out any work, carefully observe the five safety rules (Page 8).
Procedure
1. Open the control cabinet of the converter.
2. In the control cabinet, locate where the IPC is installed.
3. Route the LAN cable into the control cabinet.
4. Route the LAN cable to the IPC.
Note
Maintain the permissible cable bending radius. Route the cable so that it does not come into
contact with any sharp edges.
5. Connect the LAN cable to interface "X1 P1" of the IPC.
①
Interface X1 P1
6.2
Connection (connectivity module version that can be retrofitted)
The instructions to mount and install the connectivity module version that can be retrofitted are
https://support.industry.siemens.com/cs/ww/en/ps/25520
).
SINAMICS CONNECT 500
Operating Instructions, 10/2019
25
Содержание SINAMICS CONNECT 500
Страница 2: ......
Страница 8: ...Introduction 1 2 Naming convention SINAMICS CONNECT 500 6 Operating Instructions 10 2019 ...
Страница 14: ...Safety instructions 2 6 Security recommendations SINAMICS CONNECT 500 12 Operating Instructions 10 2019 ...
Страница 40: ...Commissioning 7 9 Completing commissioning SINAMICS CONNECT 500 38 Operating Instructions 10 2019 ...
Страница 42: ...Operation 8 1 Data evaluation with SIDRIVE IQ SINAMICS CONNECT 500 40 Operating Instructions 10 2019 ...
Страница 54: ...Service Support SINAMICS CONNECT 500 52 Operating Instructions 10 2019 ...
Страница 59: ......