2.3
The 5 safety rules
For your own personal safety and to prevent material damage when carrying out any work,
always observe the safety-relevant instructions and the following five safety rules according to
EN 50110‑1 "Working in a voltage-free state". Apply the five safety rules in the sequence stated
before starting work.
5 safety rules
1. Disconnect the system.
Also disconnect the auxiliary circuits, for example, anti-condensation heating.
2. Secure against reconnection.
3. Verify absence of operating voltage.
4. Ground and short-circuit.
5. Provide protection against adjacent live parts.
To energize the system, apply the measures in reverse order.
2.4
Electrostatic sensitive devices
Material damage due to electrostatic discharge
Electronic modules contain components that can be destroyed by electrostatic discharge.
These components can be damaged or destroyed if they are not handled correctly. To protect
equipment against damage, follow the instructions given below.
● Only touch electronic modules if you absolutely have to work on them.
● The body of the person concerned must have been electrostatically discharged and
grounded immediately before any electronic modules are touched.
● Electronic modules should not be brought into contact with electrically insulating materials,
such as:
– Plastic film
– Plastic parts
– Insulating table supports
– Clothing made of synthetic fibers
● Always place electrostatic sensitive devices on conductive bases.
● Always pack, store and transport electronic modules or components in conductive
packaging, such as:
– Metallized plastic or metal containers
– Conductive foam material
– Domestic aluminum foil
Safety instructions
2.4 Electrostatic sensitive devices
SINAMICS CONNECT 500
8
Operating Instructions, 10/2019
Содержание SINAMICS CONNECT 500
Страница 2: ......
Страница 8: ...Introduction 1 2 Naming convention SINAMICS CONNECT 500 6 Operating Instructions 10 2019 ...
Страница 14: ...Safety instructions 2 6 Security recommendations SINAMICS CONNECT 500 12 Operating Instructions 10 2019 ...
Страница 40: ...Commissioning 7 9 Completing commissioning SINAMICS CONNECT 500 38 Operating Instructions 10 2019 ...
Страница 42: ...Operation 8 1 Data evaluation with SIDRIVE IQ SINAMICS CONNECT 500 40 Operating Instructions 10 2019 ...
Страница 54: ...Service Support SINAMICS CONNECT 500 52 Operating Instructions 10 2019 ...
Страница 59: ......