1FK7 G2 synchronous motors
Operating Instructions, 05/2021, A5E50907562B AA
65
Connecting
5
5.1
Safety instructions
WARNING
Electric shock and danger to life due to other energy sources
Touching live components can result in death or severe injury.
•
Only work on electrical devices when you are qualified for this job.
•
Always observe the country-specific safety rules.
Generally, the following steps apply when establishing safety:
1.
Prepare for disconnection. Notify all those who will be affected by the procedure.
2.
Isolate the drive system from the power supply and take measures to prevent it being
switched back on again.
3.
Wait until the discharge time specified on the warning labels has elapsed.
4.
Check that there is no voltage between any of the power connections, and between any of
the power connections and the protective conductor connection.
5.
Check whether the existing auxiliary supply circuits are de-energized.
6.
Ensure that the motors cannot move.
7.
Identify all other dangerous energy sources, e.g. compressed air, hydraulic systems, or
water. Switch the energy sources to a safe state.
8.
Check that the correct drive system is completely locked.
After you have completed the work, restore the operational readiness in the inverse
sequence.
WARNING
Electric shock when connected to inadequately grounded line supplies
Connecting a motor to an inadequately grounded line supply can result in death, severe
injury and damage to the motor if a fault occurs.
•
Connect motors, as part of the drive system, to TN and TT line supplies with a grounded
neutral point or to IT line supplies.
•
Ensure that the SINAMICS devices and motors are compatible with the residual current
device according to EN 61800-5-1 before you connect the devices and motors to the line
supply using residual current devices (RCDs).
•
For line supplies with grounded line conductor, e.g. TT line supplies, use an isolating
transformer with grounded neutral point (on the secondary side) between the line
supply and the drive system, so that the motor insulation is not overstressed.
•
When connected to IT line supplies, a monitoring device must signal the first fault
between an active part and ground. Eliminate this fault immediately.
Содержание SIMOTICS S-1FK7
Страница 1: ......
Страница 2: ......
Страница 12: ...Table of contents 1FK7 G2 synchronous motors 10 Operating Instructions 05 2021 A5E50907562B AA ...
Страница 126: ...Technical data 1FK7 G2 synchronous motors 124 Operating Instructions 05 2021 A5E50907562B AA ...
Страница 127: ...1FK7 G2 synchronous motors Operating Instructions 05 2021 A5E50907562B AA 125 Appendix A ...
Страница 134: ......