Service and maintenance
9.3 General inspection guidelines
SIMOTICS A-1FV5/1PV5 synchronous/induction motors
56
Operating Instructions, 03/2014, 610.45002.40
9.3
General inspection guidelines
When inspecting a motor, you do not generally need to dismantle it. The motor only be
dismantled if the bearings need to be replaced.
While the motor is running, check that:
●
The smooth running characteristics and machine running noise have not deteriorated.
●
The cooling water system is not leaking.
Once the machine has been shut down, check that:
●
All the fixing bolts/screws for the mechanical and electrical connections have been
securely tightened.
NOTICE
If you identify any problems during the inspection, rectify them immediately. Otherwise
the machine may be damaged.
9.4
Bearing replacement intervals
The bearings are subject to wear and must be replaced after a defined number of operating
hours. For average load levels, the bearings must be replaced after approx. 20,000 h,
however, at the latest after 5 calendar years. The address for service & support is provided
in the Appendix under Siemens Service Center.