Electrical connection
6.2 Connecting the machine
1FU8
52
Operating Instructions, 02/2016, 5 610 70000 02 000
Connect the line supply voltage and arrange the disconnecting link in accordance with the
circuit diagram provided in the terminal box.
Select connecting cables according to DIN VDE 0100 taking into account the rated current
and the system-dependent conditions (e.g. ambient temperature, routing type etc. according
to DIN VDE 0298 or EN / IEC 60204-1).
The technical specifications stipulate the following that have to be taken into account with
respect to the motor connection:
●
Direction of rotation.
●
The number and arrangement of the terminal boxes.
●
The circuit and connection of the machine winding.
6.2.1
Terminal designations
With the terminal designations according to DIN VDE 0530 Part 8 or EN / IEC 60034-8 for
three-phase machines, the following principle definitions apply:
Table 6- 1
Terminal designations (with the U1-1 as an example)
U 1
-
1 Designation
x
Phase designation (U, V, W)
x
Index showing the start (1) / end (2) or tapping point of the winding (if there is
more than one connection per winding)
x Additional index for cases in which it is obligatory to connect parallel power feed
cables to several terminals with otherwise identical designations
6.2.2
Direction of rotation
The standard motors are suitable for clockwise and counter-clockwise rotation.
For defined directions of rotation (direction of rotation arrow), appropriately connect the line
power cables.
●
If you connect the line cables with phase sequence L1, L2, L3 at U, V, W or according to
NEMA at T
1
T
2
T
3
, then the machine rotates in the clockwise direction.
●
If you interchange two connections, e.g. L1, L2, L3 at V, U, W or according to NEMA at
T
2
T
1
T
3
, then the machine rotates counter-clockwise.
According to IEC
According to NEMA
Clockwise rotation
U V W
T
1
T
2
T
3
Counter-clockwise
rotation
V U W
T
2
T
1
T
3
Direction of rotation of the motor when looking at DE
Содержание SIMOTICS A 1FU8
Страница 1: ......
Страница 2: ......
Страница 10: ...Inhaltsverzeichnis 1FU8 10 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 12: ...Einleitung 1 1 Über diese Anleitung 1FU8 12 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 30: ...Beschreibung 3 3 Aufbau 1FU8 30 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 80: ...Betrieb 8 4 Ausschalten 1FU8 80 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 102: ...Ersatzteile 10 6 Explosionszeichnungen 1FU8 102 Betriebsanleitung 02 2016 5 610 70000 02 000 10 6 2 1FU8 BG 112M 160L ...
Страница 106: ......
Страница 108: ...Service Support A 3 Weitere Dokumente 1FU8 108 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 112: ......
Страница 115: ......
Страница 116: ......
Страница 124: ...Table of contents 1FU8 10 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 126: ...Introduction 1 1 About these instructions 1FU8 12 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 142: ...Description 3 3 Installation 1FU8 28 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 150: ...Preparing for use 4 7 Converter operation 1FU8 36 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 164: ...Assembly 5 5 Alignment and fastening 1FU8 50 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 206: ...Maintenance 9 8 Corrective maintenance 1FU8 92 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 212: ...Spare parts 10 6 Exploded drawings 1FU8 98 Operating Instructions 0302 2016 5 610 70000 02 000 10 6 2 1FU8 FS 112M 160L ...
Страница 216: ...Disposal 11 4 Disposal of components 1FU8 102 Operating Instructions 0302 2016 5 610 70000 02 000 ...
Страница 218: ...Service support A 3 Further documents 1FU8 104 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 225: ......
Страница 226: ......