Commissioning
5.3 Mount the oil expansion unit
BA 2030
Operating Instructions, 02/2021, A5E37880173A/RS-AM
59
Procedure
1.
Assemble the mounting kit
①
-
⑤
.
2.
Screw on the unit with the screwed connection
⑤
at the uppermost drill hole of the gearbox
housing or of the motor bearing shield.
3.
Align the oil expansion tank so that it is, as far as possible, in the vertical position. Aligning it
at an angle of ±45° to the vertical is permissible if space is restricted.
Oil expansion unit size 109 - 189
NOTICE
Hose with leaks
The hose of the oil expansion unit is subject to a natural aging process.
Check the hose for tears or leaks.
Never commission a leaky hose. Replace the hose, if necessary.
The hose of the oil expansion unit is not suitable for ambient temperatures below -25° C.
If the ambient temperatures differ, contact Technical Support.
The unit is supplied as a mounting kit. The installation is described in the supplied Compact
Installation Instructions KA 2530-1.
Figure 5-3
Example of an oil expansion unit size 109-189
Содержание SIMOGEAR BA 2030
Страница 1: ......
Страница 2: ......
Страница 68: ...Operation BA 2030 66 Operating Instructions 02 2021 A5E37880173A RS AM ...
Страница 72: ...Faults causes and remedies BA 2030 70 Operating Instructions 02 2021 A5E37880173A RS AM ...
Страница 104: ...Disposal BA 2030 102 Operating Instructions 02 2021 A5E37880173A RS AM ...
Страница 183: ...BA 2030 Operating Instructions 02 2021 A5E37880173A RS AM 181 Declaration of incorporation declaration of conformity 12 ...
Страница 204: ...Declaration of incorporation declaration of conformity BA 2030 202 Operating Instructions 02 2021 A5E37880173A RS AM ...
Страница 206: ...Your suggestions BA 2030 204 Operating Instructions 02 2021 A5E37880173A RS AM ...
Страница 207: ......
Страница 208: ......