background image

 

 

USB-Prommer 

Содержание SIMATIC USB-Prommer

Страница 1: ...USB Prommer ...

Страница 2: ...ge and Function 1 Hardware Installation 2 Software Installation 3 Connecting to the PC 4 Working with the SIMATIC USB Prommer 5 Firmware Update 6 Fault Diagnostics 7 Specifications 8 Additional Support and Sales Information 9 Certificates Guidelines and Declarations 10 ...

Страница 3: ...ly by personnel qualified for the specific task in accordance with the relevant documentation in particular its warning notices and safety instructions Qualified personnel are those who based on their training and experience are capable of identifying risks and avoiding potential hazards when working with these products systems Proper use of Siemens products Note the following WARNING Siemens prod...

Страница 4: ...d Function 4 2 Hardware Installation 5 3 Software Installation 8 4 Connecting to the PC 9 5 Working with the SIMATIC USB Prommer 10 6 Firmware Update 11 7 Fault Diagnostics 12 8 Specifications 13 9 Additional Support and Sales Information 15 10 Certificates Guidelines and Declarations 16 ...

Страница 5: ...of the SIMATIC USB Prommer Together with the associated SIMATIC software you can use the SIMATIC USB Prommer to read and program SIMATIC S5 memory modules SIMATIC Memory Cards and SIMATIC Micro Memory Cards For editing SIMATIC S5 EPROM modules the SIMATIC S5 programming adapter must be plugged in The adapter is included in the product package The SIMATIC USB Prommer is compatible with USB V1 1 and...

Страница 6: ...ice rear you will find The power supply connector for connection of the plug in power supply The USB port type B for connection to the PC Front of the device On the device front you will find SIMATIC Micro Memory Card interface SIMATIC S5 S7 Memory Card interface MEM CARD Two operating state displays BUSY POWER ...

Страница 7: ...C If you want to edit SIMATIC S7 Memory Cards SIMATIC S5 EPROM modules or SIMATIC S5 Memory Cards you must also supply the SIMATIC USB Prommer with power via the plug in power supply POWER LED lights up in green The supplied power supply is a wide range power supply it can be adapted to fit the respective power outlet of a specific country e g the United States by using an adapter Connecting the p...

Страница 8: ...operating the SIMATIC USB Prommer with an external power supply you may only use the supplied plug in power supply CAUTION Plug in power supply A power source with limited power is required for the operation of the SIMATIC USB Prommer USA Canada NEC Class 2 The supplied plug in power supply meets these requirements ...

Страница 9: ...off follow these steps 1 Insert your SIMATIC USB Prommer product CD into the CD ROM drive 2 Open the root directory in this drive 3 Start the setup program with a double click on the setup exe file The setup program will guide you through the entire installation Observe the notes regarding the installation and use of the SIMATIC USB Prommer software in the Readme file that is located in the root d...

Страница 10: ... During initial operation of the SIMATIC USB Prommer you must set the programming interface to External prommer at the USB port in the Control Panel with the Memory Card Parameter Assignment panel When you select the setting Detect USB prommer automatically the connection of the SIMATIC USB Prommer to the PC is detected automatically NOTICE USB cable Connect the SIMATIC USB Prommer to the PC only ...

Страница 11: ...n the SIMATIC STEP 7 software or the SIMATIC STEP 5 software 4 Make sure that the programming interface of your SIMATIC software is set to External prommer at the USB port with the Memory Card Parameter Assignment panel 5 Edit your storage medium 6 Remove the storage medium when you are done with editing NOTICE Programming The BUSY LED lights up during programming Do not unplug the memory module t...

Страница 12: ...p www siemens com automation service support Follow these steps when updating the firmware 1 Search for the term USB Prommer in the product support 2 Download the self extracting exe file of the offered firmware and the firmware tool to your PC 3 Unzip the files to a local drive and update the firmware on your SIMATIC USB Prommer by following the instructions of the firmware update tool 4 Also rea...

Страница 13: ...xists Plug in USB cable Switch on the PC Permissible operating mode Installing drivers Check the version of the SIMATIC STEP 7 software Contact Customer Support or your Siemens contact person POWER LED does not light up in green USB cable not plugged in Plug in power supply not plugged in or defec tive Plug in USB cable Plug in or replace plug in power supply Continuous flashing at the POWER LED H...

Страница 14: ...EN 62368 1 UL 62368 1 Second Edition CAN CSA C22 2 No 62368 1 14 Second Edition Electromagnetic compatibility EMC Emitted interference Limit value class B according to EN55032 Immunity to line borne interference on supply lines 2 kV according to IEC 61000 4 4 burst 1 kV according to IEC 61000 4 5 surge symmetrical 2 kV according to IEC 61000 4 5 surge asymmetrical Noise immunity on signal lines 1 ...

Страница 15: ...n tested according to DIN IEC0 60068 2 30 DIN IEC 60068 2 14 5 to 80 at 25 C no condensation 5 to 95 at 25 C no condensation Mechanical ambient conditions Vibration Operation Storage transportation tested according to DIN IEC 60068 2 6 10 to 58 Hz Amplitude 0 075 mm 58 Hz to 500 Hz Accelera tion 9 8 m s 5 to 9 Hz Amplitude 3 5 mm 9 Hz to 500 Hz Acceleration 9 8 m s Resistance to shock Operation St...

Страница 16: ...iety of courses Contact your regional training center or the central training center in Nuremberg Germany Internet http www sitrain com http www sitrain com Siemens Industry Online Support You can obtain up to date information quickly and easily on the following topics Product Support All information and extensive know how about your product technical specifications FAQs certificates downloads and...

Страница 17: ...61000 3 2 harmonic currents and EN 61000 3 3 voltage fluctuation and flicker are observed Low voltage directive This product meets the requirements of EU Directive 2014 35 EU Low Voltage Directive Conformance with this standard has been verified according to EN62368 1 RoHs directive This product meets the requirements of RoHS Directive 2011 65 EU Restriction of the use of certain hazardous substan...

Страница 18: ...ested and found to comply with the limits for a Class A digital de vice pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may...

Страница 19: ...umérique de la classe B est conforme à la norme NMB 003 du Canada RCM AUSTRALIA NEW ZEALAND This product meets the requirements of the standard EN 61000 6 3 Generic standards Emission standard for residential commercial and light industrial environments This product meets the requirements of the standard EN 61000 6 3 Generic standards Emission standard for residential commercial and light industri...

Отзывы: