
S7-300 Programmable Controller Hardware and Installation
A5E00105492-01
Index-1
Index
A
Accessories............................................. 5-2
wiring.................................................. 6-1
Accumulator .......................................... 12-1
Actuator/Sensor Interface ..................... 4-29
Address ................................................. 12-1
Addresses
analog modules ................................. 7-5
digital modules ................................... 7-3
integrated I/O of CPUs....................... 7-6
technological functions ...................... 7-7
Addressing
slot-based .......................................... 7-1
user-defined ................................7-1, 7-3
Analog module ...................................... 12-1
addresses .......................................... 7-5
Arrangement
the modules ....................................... 4-7
Asynchronous error............................... 10-4
B
Backplane Bus ...................................... 12-1
Backup
inserting ............................................. 8-6
operating system ............................... 9-2
Backup battery
disposal............................................ 9-10
handling rules .................................. 9-10
replacing ............................................ 9-8
storing .............................................. 9-10
Backup memory .................................... 12-1
Basic knowledge required....................... 1-1
Bus ........................................................ 12-2
Backplane ........................................ 12-1
Bus connector ....................................... 4-36
connecting the bus cable ................. 6-16
connecting to module....................... 6-17
plug .................................................... 5-8
removing .......................................... 6-17
set terminating resistor .................... 6-17
Bus segment ......................................... 12-1
Bus termination ..................................... 4-45
BUSF
LED ................................................ 10-11
BUSF1
LED ................................................10-11
BUSF2
LED ................................................10-11
C
Cabinet
dimensions .......................................4-12
power loss dissipated.......................4-13
selecting and dimensioning..............4-11
types.................................................4-11
Cable
preparing ............................................6-9
Cable lengths
longer ...............................................4-38
maximum..........................................4-37
MPI subnet .......................................4-38
PROFIBUS subnet ...........................4-38
stub cables .......................................4-38
Cable routing inside buildings .............11-14
Cable shielding....................................11-12
ground ..............................................4-22
Clearance ................................................4-6
Code block ............................................12-2
Cold restart ............................................8-16
with keyswitch ..................................8-16
Commissioning
checklist..............................................8-4
CPU 31x-2 DP as DP master...........8-26
CPU 31x-2 DP as DP slave .............8-29
CPU 31xC-2 DP as DP master ........8-26
CPU 31xC-2 DP as DP slave...........8-29
PROFIBUS-DP.................................8-24
reaction to errors ................................8-3
recommended hardware procedure ...8-2
software requirements........................8-1
using the software ..............................8-3
Components
a S7-300.............................................3-1
Compress ..............................................12-2
Configuration .........................................12-2
Connecting
PG ......................................................8-9
sensors and actors.............................6-8
spring terminals ..................................6-8
Connecting actors ...................................6-8
Содержание Simatic S7-300
Страница 10: ...Contents S7 300 Programmable Controller Hardware and Installation x A5E00105492 01 ...
Страница 16: ...Preface S7 300 Programmable Controller Hardware and Installation 1 6 A5E00105492 01 ...
Страница 22: ...Quick Guide S7 300 Programmable Controller Hardware and Installation 2 6 A5E00105492 01 ...
Страница 28: ...Product overview S7 300 Programmable Controller Hardware and Installation 3 6 A5E00105492 01 ...
Страница 74: ...Configuring S7 300 Programmable Controller Hardware and Installation 4 46 A5E00105492 01 ...
Страница 102: ...Wiring S7 300 Programmable Controller Hardware and Installation 6 18 A5E00105492 01 ...
Страница 148: ...Commissioning S7 300 Programmable Controller Hardware and Installation 8 36 A5E00105492 01 ...
Страница 236: ...Glossary S7 300 Programmable Controller Hardware and Installation 12 16 A5E00105492 01 ...