Batch
8-10
SIMATIC PCS 7 OSx 4.1.2 Operator
8.7
Changing Batch State
The batch tag detail enables the operator to monitor a batch. An operator
with the correct security privilege can issue commands to a batch or unit.
To change the operational state of a batch and its assigned units, select the
State field. OSx displays a command form that lists the batch state options
). The selected command is also propagated to the units assigned
to the batch.
After creating an active batch, follow these steps to start the batch.
1.
Access the batch tag detail. Refer to
2.
Select the
Start
option from the State field on the
Batch Tag Detail.
The
system sends the Start command to the batch and propagates it to the
units assigned to the batch.
The Start option sends the
Start
command to all units currently assigned to
the batch. Other functions built into the batch program by the plant
engineer can cause other processes to occur when the operator selects the
Start option.
NOTE:
At least one unit must be assigned to the batch before starting it.
Refer to
for instructions on assigning units to a batch.
Alarm Group:
Alarm State Sequencing:
Alarming:
State:
Figure 8-8
Changing Batch State
Changing the State
of a Batch
Starting a Batch
Содержание SIMATIC PCS 7 OSx
Страница 6: ......
Страница 12: ...viii Contents Appendix A Advanced Operator Tasks A 1 Index Index 1 ...
Страница 22: ...Preface xviii SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 102: ...OSx Station Control 2 20 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 124: ...Trends 4 12 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 172: ...Action Requests 7 20 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 192: ...Batch 8 20 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 205: ...Reports 9 13 SIMATIC PCS 7 OSx 4 1 2 Operator Figure 9 7 Entering Time Schedule Data ...
Страница 222: ...Navigation A 2 SIMATIC PCS 7 OSx 4 1 2 Operator ...